HS2 enabling works near Cubbington, September 2021 (5)

Introduction

The photograph on this page of HS2 enabling works near Cubbington, September 2021 (5) by Robin Stott as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

HS2 enabling works near Cubbington, September 2021 (5)

Image: © Robin Stott Taken: 17 Sep 2021

New fences and gates have been erected alongside the B4453 Rugby Road. This is in advance of the road being diverted to cross HS2 by an overbridge yet to be built. The stretch of footpath W130b behind the camera will be closed and will instead follow the road north to its diversion along the south side of North Cubbington Wood. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/532882/C223-CSI-CV-DPP-030-000004-FPD.pdf

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
52.315235
Longitude
-1.494301