HS2 works at Crackley, January 2021 (1)
Introduction
The photograph on this page of HS2 works at Crackley, January 2021 (1) by Robin Stott as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Robin Stott Taken: 22 Jan 2021
A farm track has been surfaced to form a contractor's access to the site of a rather eventful stretch of HS2 in civil engineering terms. There will be cuttings to take the line beneath realigned roads and the Coventry-Leamington railway, emerging briefly at crossings of the realigned Canley Brook, and a culvert northeast of Crackley Wood. The viewpoint is a gate beyond the sewage pumping station northeast of Crackley Crescent, just off the A429 Kenilworth Road. The red building above centre is thought to be Cryfield Grange Image Reference: File 'Route passes Kenilworth Golf Club' downloaded from the gov.uk website https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/532881/C223-CSI-CV-DPP-030-000005-FPD.pdf Also identified as Sheet 38 of the outline plan, confirmed 2016.