Construction Work at Crumpsall Metrolink Station, March 2019

Introduction

The photograph on this page of Construction Work at Crumpsall Metrolink Station, March 2019 by David Dixon as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Construction Work at Crumpsall Metrolink Station, March 2019

Image: © David Dixon Taken: 11 Mar 2019

Major upgrade work to upgrade the station began in August 2017 in readiness for the stop to act as the northern terminus for the new six-stop line which is planned to run directly from the Trafford Centre through the city centre and onto the upgraded Crumpsall stop. As well as changes to the existing platforms, the major work involves creating a new entrance from Crumpsall Lane, with both stepped and step-free access. The existing inbound platform is being enlarged to form a new island platform with a turnback facility on the eastern side of the current inbound platform. North bound trams will be able to return southwards to Manchester city centre from this stop; similar to Shaw and Compton on the Manchester, Oldham and Rochdale line. The new line is scheduled to be operational by 2020. Image] shows an artist's impression of how the upgraded station is expected to look when the upgrade has been completed.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
53.516503
Longitude
-2.240654