Borders Railway under construction
Introduction
The photograph on this page of Borders Railway under construction by Oliver Dixon as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Oliver Dixon Taken: 5 May 2014
This trackbed was part of the so-called "Waverley" line from Edinburgh to Carlisle built in 1849. The line was closed in 1969 but now, under the Borders Railway project, is due to be reopened from Edinburgh as far as Tweedbank about 1 km to the east of this spot. Construction started in early 2012 and the line is scheduled to be opened for traffic in summer, 2015. A tarmac path followed the trackbed which carried both the Southern Uplands Way and National Cycle Network route 1. The Southern Uplands Way has been diverted over Galafoot Bridge and along the river bank; it is not clear what alternative provision has been made for cyclists on the National Cycle Route.
