Wark Bridge (closed for repairs)
Introduction
The photograph on this page of Wark Bridge (closed for repairs) by Les Hull as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Les Hull Taken: 6 Mar 2013
A week-long survey into the deteriorating condition of Wark Bridge has been carried out. A £35,000 corrosion examination was carried out by Northumberland County Council to identify how rapidly the bridge is rotting. There are fears that the 132-year-old metal structure may be forced to close. A three-tonnes weight limit was placed on the bridge last year as it becomes increasingly unstable, and worried residents have strung together a 1,200 name petition to help save the bridge from ruin. http://www.hexhamcourant.co.uk/news/2.2978/wark-bridge-undergoes-survey-1.722080?referrerPath=home/2.3307 MOTORISTS in Wark have been given a week’s reprieve before the village’s ancient bridge closes for a whole year. Despite signs posted around the village saying the deteriorating structure would be out of use from Monday, its closure has been delayed until February 4 due to the current adverse weather conditions. The bridge will be closed to vehicles for up to 52 weeks as Northumberland County Council works to renovate it. The work is phase two of the five-year project to save the 134-year-old bridge. http://www.hexhamcourant.co.uk/wark-countdown-to-bridge-closure-1.1031315?referrerPath=home/2.3307
