The Galashiels Inner Relief Road Phase Two

Introduction

The photograph on this page of The Galashiels Inner Relief Road Phase Two by Walter Baxter as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

The Galashiels Inner Relief Road Phase Two

Image: © Walter Baxter Taken: 29 Aug 2009

The second phase of the new Inner Relief Road scheme in the town started on 29th June 2009 and is expected to be completed by the end of January 2010. This photo, taken from the location of a new roundabout at Paton Street, shows the construction work in progress of a new link road up to Albert Place. Several buildings have been demolished to make way for the new road.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
55.613787
Longitude
-2.803917