PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Palanza Terrace, BRIDLINGTON, YO15 3EF

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Palanza Terrace, YO15 3EF are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Palanza Terrace, BRIDLINGTON, YO15 3EF
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
05a Palanza Terrace
Date
14 Jul 2023
Current
Potential
81
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2023
+
Certificate History
14 Jul 2023
81
81
14 Jun 2023
77
77
Total Floor Area
36 sq m
Current CO2 Emissions Level
1.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
10 Palanza Terrace
Date
13 Jan 2015
Current
Potential
56
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
13 Jan 2015
56
84
13 Jan 2015
56
84
27 Aug 2014
59
80
28 Feb 2013
59
76
Total Floor Area
97 sq m
Current CO2 Emissions Level
5.6
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
58
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
11 Palanza Terrace
Date
2 Sep 2013
Current
Potential
50
78
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
2 Sep 2013
50
78
11 Jul 2013
51
84
1 Apr 2013
55
79
Total Floor Area
105 sq m
Current CO2 Emissions Level
6.0
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
57
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
12 Palanza Terrace
Date
25 Mar 2023
Current
Potential
69
81
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
25 Mar 2023
69
81
27 Apr 2015
59
77
31 Mar 2015
49
77
1 Dec 2014
4
84
10 Nov 2012
41
65
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
13 Palanza Terrace
Date
11 Jul 2013
Current
Potential
69
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
11 Jul 2013
69
86
Total Floor Area
85 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
14 Palanza Terrace
Date
22 Nov 2022
Current
Potential
64
79
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
22 Nov 2022
64
79
Total Floor Area
92 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
6 Palanza Terrace
Date
1 Dec 2014
Current
Potential
47
84
Property Type
House
Built Form
End-Terrace
Constructed
before 1900
+
Certificate History
1 Dec 2014
47
84
15 Oct 2013
11
76
8 Apr 2013
2
71
23 Mar 2009
1
1
Total Floor Area
104 sq m
Current CO2 Emissions Level
6.8
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
66
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
7 Palanza Terrace
Date
27 Aug 2013
Current
Potential
58
80
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
27 Aug 2013
58
80
14 Jul 2013
54
80
4 Jun 2013
60
74
21 Mar 2013
52
69
Total Floor Area
103 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
8 Palanza Terrace
Date
5 Sep 2013
Current
Potential
46
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
5 Sep 2013
46
83
Total Floor Area
109 sq m
Current CO2 Emissions Level
6.8
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
62
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
9 Palanza Terrace
Date
8 Nov 2019
Current
Potential
54
77
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
8 Nov 2019
54
77
3 Sep 2013
18
82
15 Jul 2013
7
82
Total Floor Area
114 sq m
Current CO2 Emissions Level
6.4
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
56
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.