PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Bluebell Close, MALVERN, WR14 3SW

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Bluebell Close, WR14 3SW are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Bluebell Close, MALVERN, WR14 3SW
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
42 Bluebell Close
Date
23 May 2022
Current
Potential
29
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
23 May 2022
29
87
Total Floor Area
90 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
73
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
22 Bluebell Close
Date
4 Nov 2013
Current
Potential
86
92
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
4 Nov 2013
86
92
Total Floor Area
95 sq m
Current CO2 Emissions Level
1.4
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
23 Bluebell Close
Date
17 Nov 2010
Current
Potential
65
74
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
17 Nov 2010
65
74
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
23 BLUEBELL CLOSE, MALVERN
Date
21 Dec 2020
Current
Potential
74
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
21 Dec 2020
74
86
Total Floor Area
89 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
25 Bluebell Close
Date
14 Dec 2021
Current
Potential
73
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
14 Dec 2021
73
90
Total Floor Area
81 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
26 Bluebell Close
Date
26 May 2022
Current
Potential
72
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
26 May 2022
72
85
Total Floor Area
87 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
27 Bluebell Close
Date
4 Nov 2013
Current
Potential
60
85
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
4 Nov 2013
60
85
Total Floor Area
85 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
28 Bluebell Close
Date
17 Nov 2022
Current
Potential
84
91
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
17 Nov 2022
84
91
30 Nov 2021
51
83
Total Floor Area
82 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
14
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
29 Bluebell Close
Date
14 Dec 2021
Current
Potential
67
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
14 Dec 2021
67
83
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
31 Bluebell Close
Date
11 Apr 2022
Current
Potential
70
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
11 Apr 2022
70
87
Total Floor Area
82 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
34 Bluebell Close
Date
25 Feb 2014
Current
Potential
60
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
25 Feb 2014
60
86
Total Floor Area
87 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
36 Bluebell Close
Date
6 Nov 2024
Current
Potential
57
75
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
6 Nov 2024
57
75
Total Floor Area
97 sq m
Current CO2 Emissions Level
7.3
Potential CO2 Emissions Level
4.8
CO2 per sq m per Year
75
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
2
Address
38 Bluebell Close
Date
17 Feb 2022
Current
Potential
34
80
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
17 Feb 2022
34
80
Total Floor Area
90 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
65
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
42 Bluebell Close
Date
26 Apr 2022
Current
Potential
48
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
26 Apr 2022
48
82
Total Floor Area
92 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
3.5
CO2 per sq m per Year
80
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
44 Bluebell Close
Date
28 Feb 2022
Current
Potential
72
84
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
28 Feb 2022
72
84
Total Floor Area
93 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
45 Bluebell Close
Date
13 Aug 2019
Current
Potential
68
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
13 Aug 2019
68
84
Total Floor Area
108 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
46 Bluebell Close
Date
7 Nov 2024
Current
Potential
73
84
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
7 Nov 2024
73
84
14 Jun 2013
70
83
Total Floor Area
87 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
48 Bluebell Close
Date
24 Mar 2014
Current
Potential
76
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
24 Mar 2014
76
87
9 Sep 2013
72
90
Total Floor Area
112 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
25
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
49 Bluebell Close
Date
8 Jul 2015
Current
Potential
73
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
8 Jul 2015
73
87
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
50 Bluebell Close
Date
24 Nov 2022
Current
Potential
88
93
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
24 Nov 2022
88
93
30 Jun 2022
50
87
14 Dec 2021
59
84
14 Dec 2021
29
87
Total Floor Area
81 sq m
Current CO2 Emissions Level
0.8
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
10
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
52 Bluebell Close
Date
9 Jul 2020
Current
Potential
69
86
Property Type
House
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
9 Jul 2020
69
86
17 Feb 2009
54
70
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
56 Bluebell Close
Date
9 Jun 2014
Current
Potential
50
84
Property Type
House
Built Form
Semi-Detached
Constructed
1983-1990
+
Certificate History
9 Jun 2014
50
84
Total Floor Area
64 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
101
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
57 Bluebell Close
Date
8 Sep 2013
Current
Potential
65
88
Property Type
House
Built Form
Semi-Detached
Constructed
1991-1995
+
Certificate History
8 Sep 2013
65
88
Total Floor Area
59 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
73
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.