PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Hospital Bank, MALVERN, WR14 1PQ

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Hospital Bank, WR14 1PQ are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Hospital Bank, MALVERN, WR14 1PQ
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 Hospital Bank
Date
30 Jul 2018
Current
Potential
52
84
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
30 Jul 2018
52
84
31 Aug 2015
1
30
Total Floor Area
84 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
61
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
15 Hospital Bank
Date
23 Aug 2023
Current
Potential
59
80
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
23 Aug 2023
59
80
Total Floor Area
114 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
17 Hospital Bank
Date
15 Aug 2021
Current
Potential
40
85
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
15 Aug 2021
40
85
2 Jun 2019
40
83
Total Floor Area
85 sq m
Current CO2 Emissions Level
8.7
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
103
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
2
Address
19 Hospital Bank
Date
28 Feb 2020
Current
Potential
61
88
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
28 Feb 2020
61
88
Total Floor Area
87 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
2 Hospital Bank
Date
13 Oct 2019
Current
Potential
55
85
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
13 Oct 2019
55
85
18 Jun 2009
30
30
Total Floor Area
63 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
64
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
3 Hospital Bank
Date
1 Mar 2019
Current
Potential
70
89
Property Type
House
Built Form
Enclosed End-Terrace
Constructed
1900-1929
+
Certificate History
1 Mar 2019
70
89
14 May 2012
48
81
Total Floor Area
70 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
4 Hospital Bank
Date
22 Oct 2024
Current
Potential
78
88
Property Type
House
Built Form
Semi-Detached
Constructed
2007-2011
+
Certificate History
22 Oct 2024
78
88
Total Floor Area
98 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
4a Hospital Bank
Date
3 Oct 2018
Current
Potential
74
86
Property Type
House
Built Form
Semi-Detached
Constructed
2003-2006
+
Certificate History
3 Oct 2018
74
86
Total Floor Area
96 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
5 Hospital Bank
Date
15 Aug 2016
Current
Potential
68
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
15 Aug 2016
68
88
26 Aug 2014
39
77
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
7 Hospital Bank
Date
5 Mar 2019
Current
Potential
67
87
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
5 Mar 2019
67
87
Total Floor Area
70 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
8 Hospital Bank
Date
20 Jun 2010
Current
Potential
50
50
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
20 Jun 2010
50
50
Total Floor Area
93 sq m
Current CO2 Emissions Level
7.8
Potential CO2 Emissions Level
7.8
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
Redwood Lodge, Hospital Bank
Date
3 May 2012
Current
Potential
51
84
Property Type
House
Built Form
End-Terrace
Constructed
before 1900
+
Certificate History
3 May 2012
51
84
Total Floor Area
138 sq m
Current CO2 Emissions Level
7.7
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
55
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.