PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Pinewood Road, MIDDLESBROUGH, TS7 8DB

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Pinewood Road, TS7 8DB are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Pinewood Road, MIDDLESBROUGH, TS7 8DB
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 Pinewood Road, Marton-in-Cleveland
Date
8 Feb 2013
Current
Potential
41
77
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
8 Feb 2013
41
77
Total Floor Area
97 sq m
Current CO2 Emissions Level
7.1
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
73
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
11 Pinewood Road, Marton-in-Cleveland
Date
29 Jul 2018
Current
Potential
58
82
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
29 Jul 2018
58
82
Total Floor Area
110 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
2
Address
12 Pinewood Road, Marton-in-Cleveland
Date
22 Sep 2014
Current
Potential
70
84
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
22 Sep 2014
70
84
Total Floor Area
89 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
13 Pinewood Road, Marton-in-Cleveland
Date
30 Jul 2014
Current
Potential
72
82
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
30 Jul 2014
72
82
Total Floor Area
140 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
3
Address
15 Pinewood Road, Marton-in-Cleveland
Date
24 Feb 2014
Current
Potential
76
83
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
24 Feb 2014
76
83
Total Floor Area
153 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
25
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
2
Address
18 PINEWOOD ROAD, MIDDLESBROUGH
Date
11 Jan 2021
Current
Potential
75
83
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
11 Jan 2021
75
83
Total Floor Area
146 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
2
Address
2 Pinewood Road, Marton-In-Cleveland
Date
4 Sep 2022
Current
Potential
64
78
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
4 Sep 2022
64
78
Total Floor Area
104 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
21 Pinewood Road, Marton-in-Cleveland
Date
27 Jan 2015
Current
Potential
68
81
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
27 Jan 2015
68
81
Total Floor Area
99 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
24 Pinewood Road, Marton-In-Cleveland
Date
6 Jun 2022
Current
Potential
59
79
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
6 Jun 2022
59
79
Total Floor Area
82 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
26 Pinewood Road, Marton-in-Cleveland
Date
13 Aug 2012
Current
Potential
70
88
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
13 Aug 2012
70
88
Total Floor Area
73 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
27 Pinewood Road, Marton-In-Cleveland
Date
14 Jan 2022
Current
Potential
72
84
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
14 Jan 2022
72
84
Total Floor Area
89 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
29 Pinewood Road, Marton-in-Cleveland
Date
11 Jan 2013
Current
Potential
66
85
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
11 Jan 2013
66
85
Total Floor Area
87 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
3 Pinewood Road, Marton-In-Cleveland
Date
9 Apr 2024
Current
Potential
60
84
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
9 Apr 2024
60
84
Total Floor Area
81 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
30 Pinewood Road, Marton-in-Cleveland
Date
20 Jun 2016
Current
Potential
56
85
Property Type
House
Built Form
Detached
Constructed
1976-1982
+
Certificate History
20 Jun 2016
56
85
Total Floor Area
87 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
61
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
31 Pinewood Road, Marton-in-Cleveland
Date
14 Apr 2014
Current
Potential
59
80
Property Type
House
Built Form
Detached
Constructed
1976-1982
+
Certificate History
14 Apr 2014
59
80
Total Floor Area
178 sq m
Current CO2 Emissions Level
8.3
Potential CO2 Emissions Level
4.1
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
35 Pinewood Road, Marton-In-Cleveland
Date
22 Sep 2022
Current
Potential
68
81
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
22 Sep 2022
68
81
Total Floor Area
94 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
37 Pinewood Road, Marton-in-Cleveland
Date
17 Sep 2019
Current
Potential
60
85
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
17 Sep 2019
60
85
Total Floor Area
87 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
5 Pinewood Road, Marton-in-Cleveland
Date
18 Jun 2017
Current
Potential
64
81
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
18 Jun 2017
64
81
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.