PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Montreal Road, SEVENOAKS, TN13 2EP

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Montreal Road, TN13 2EP are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Montreal Road, SEVENOAKS, TN13 2EP
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
Ashwood, Montreal Road
Date
14 May 2024
Current
Potential
54
75
Property Type
House
Built Form
Detached
Constructed
1930-1949
+
Certificate History
14 May 2024
54
75
Total Floor Area
129 sq m
Current CO2 Emissions Level
6.9
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
Casita, Montreal Road
Date
23 Mar 2016
Current
Potential
50
73
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
23 Mar 2016
50
73
Total Floor Area
169 sq m
Current CO2 Emissions Level
9.8
Potential CO2 Emissions Level
5.3
CO2 per sq m per Year
58
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
Cawdries, Montreal Road
Date
28 Aug 2023
Current
Potential
63
75
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
28 Aug 2023
63
75
Total Floor Area
237 sq m
Current CO2 Emissions Level
9.5
Potential CO2 Emissions Level
6.5
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
3
Address
CORNARDS, MONTREAL ROAD
Date
26 Apr 2021
Current
Potential
58
77
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
26 Apr 2021
58
77
Total Floor Area
202 sq m
Current CO2 Emissions Level
9.4
Potential CO2 Emissions Level
5.0
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
1
Address
Cornerways, Montreal Road
Date
23 Jul 2023
Current
Potential
64
84
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
23 Jul 2023
64
84
19 Apr 2012
62
82
Total Floor Area
91 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
Ewarts, Montreal Road
Date
25 Apr 2011
Current
Potential
50
65
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
25 Apr 2011
50
65
Total Floor Area
152 sq m
Current CO2 Emissions Level
8.2
Potential CO2 Emissions Level
5.6
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
2
Address
Glenwood, Montreal Road
Date
15 Sep 2013
Current
Potential
51
74
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
15 Sep 2013
51
74
Total Floor Area
188 sq m
Current CO2 Emissions Level
9.5
Potential CO2 Emissions Level
4.8
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
Holmoak, Montreal Road
Date
14 Mar 2024
Current
Potential
66
76
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
14 Mar 2024
66
76
20 Sep 2009
47
70
Total Floor Area
206 sq m
Current CO2 Emissions Level
6.6
Potential CO2 Emissions Level
4.5
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
2
Address
Little Hammers, Montreal Road
Date
13 Sep 2009
Current
Potential
59
66
Property Type
House
Built Form
Detached
Constructed
1983-1990
+
Certificate History
13 Sep 2009
59
66
Total Floor Area
174 sq m
Current CO2 Emissions Level
7.7
Potential CO2 Emissions Level
6.6
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
0
Address
Longview, Montreal Road
Date
13 Sep 2015
Current
Potential
40
84
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
13 Sep 2015
40
84
Total Floor Area
169 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
72
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
Malleny, Montreal Road
Date
9 Jul 2009
Current
Potential
42
62
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
9 Jul 2009
42
62
Total Floor Area
242 sq m
Current CO2 Emissions Level
13.0
Potential CO2 Emissions Level
8.3
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
1
Address
Oak Beams, Montreal Road
Date
11 Oct 2011
Current
Potential
51
53
Property Type
House
Built Form
Detached
Constructed
1900-1929
+
Certificate History
11 Oct 2011
51
53
Total Floor Area
202 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
12.0
CO2 per sq m per Year
52
Mains Gas Available
Yes
Habitable Rooms
10
Number of Extensions
1
Address
RIVERHEAD COTTAGE, MONTREAL ROAD
Date
27 Oct 2020
Current
Potential
49
72
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
27 Oct 2020
49
72
Total Floor Area
228 sq m
Current CO2 Emissions Level
13.0
Potential CO2 Emissions Level
7.1
CO2 per sq m per Year
57
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
3
Address
Sandalwood, Montreal Road
Date
18 May 2022
Current
Potential
66
80
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
18 May 2022
66
80
16 Nov 2015
52
73
Total Floor Area
199 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
2
Address
The Alders, Montreal Road
Date
27 May 2015
Current
Potential
65
75
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
27 May 2015
65
75
Total Floor Area
265 sq m
Current CO2 Emissions Level
9.8
Potential CO2 Emissions Level
7.0
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
10
Number of Extensions
3
Address
The Orchard, Montreal Road
Date
30 May 2023
Current
Potential
63
77
Property Type
House
Built Form
Detached
Constructed
1930-1949
+
Certificate History
30 May 2023
63
77
23 Feb 2017
54
80
Total Floor Area
223 sq m
Current CO2 Emissions Level
7.8
Potential CO2 Emissions Level
4.6
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
1
Address
The Red House, Montreal Road
Date
12 Aug 2019
Current
Potential
52
78
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
12 Aug 2019
52
78
2 Jul 2009
39
46
Total Floor Area
254 sq m
Current CO2 Emissions Level
13.0
Potential CO2 Emissions Level
5.7
CO2 per sq m per Year
52
Mains Gas Available
Yes
Habitable Rooms
9
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.