PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Orchard Drive, MERRIOTT, TA16 5AA

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Orchard Drive, TA16 5AA are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Orchard Drive, MERRIOTT, TA16 5AA
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Orchard Drive
Date
8 Feb 2016
Current
Potential
89
91
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
8 Feb 2016
89
91
8 Feb 2016
88
89
Total Floor Area
71 sq m
Current CO2 Emissions Level
0.6
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
8
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
11 Orchard Drive
Date
15 Dec 2017
Current
Potential
89
90
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
15 Dec 2017
89
90
Total Floor Area
93 sq m
Current CO2 Emissions Level
0.8
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
9
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
15 Orchard Drive
Date
23 Nov 2017
Current
Potential
90
91
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
23 Nov 2017
90
91
Total Floor Area
97 sq m
Current CO2 Emissions Level
0.7
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
8
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
17 Orchard Drive
Date
1 Mar 2018
Current
Potential
90
91
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
1 Mar 2018
90
91
Total Floor Area
93 sq m
Current CO2 Emissions Level
0.7
Potential CO2 Emissions Level
0.5
CO2 per sq m per Year
8
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
19 Orchard Drive
Date
1 Mar 2018
Current
Potential
90
91
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
1 Mar 2018
90
91
Total Floor Area
93 sq m
Current CO2 Emissions Level
0.7
Potential CO2 Emissions Level
0.5
CO2 per sq m per Year
8
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
21 Orchard Drive
Date
1 Jul 2018
Current
Potential
90
91
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
1 Jul 2018
90
91
Total Floor Area
114 sq m
Current CO2 Emissions Level
1.0
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
9
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
23 Orchard Drive
Date
20 Jan 2020
Current
Potential
95
95
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
20 Jan 2020
95
95
Total Floor Area
231 sq m
Current CO2 Emissions Level
1.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
5
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
25 Orchard Drive
Date
19 Aug 2019
Current
Potential
94
95
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
19 Aug 2019
94
95
29 Jul 2019
94
107
20 Dec 2018
74
92
Total Floor Area
208 sq m
Current CO2 Emissions Level
0.2
Potential CO2 Emissions Level
-0.1
CO2 per sq m per Year
0
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
3 Orchard Drive
Date
26 Feb 2016
Current
Potential
92
93
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
26 Feb 2016
92
93
Total Floor Area
69 sq m
Current CO2 Emissions Level
0.4
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
5
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
5 Orchard Drive
Date
8 Feb 2016
Current
Potential
92
93
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
8 Feb 2016
92
93
8 Feb 2016
91
92
Total Floor Area
69 sq m
Current CO2 Emissions Level
0.4
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
5
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
7 Orchard Drive
Date
26 Feb 2016
Current
Potential
91
92
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
26 Feb 2016
91
92
Total Floor Area
69 sq m
Current CO2 Emissions Level
0.4
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
6
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
9 Orchard Drive
Date
26 Feb 2016
Current
Potential
90
91
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
26 Feb 2016
90
91
Total Floor Area
69 sq m
Current CO2 Emissions Level
0.5
Potential CO2 Emissions Level
0.3
CO2 per sq m per Year
7
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.