PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Moelfre, OSWESTRY, SY10 7QL

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for SY10 7QL are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Moelfre, OSWESTRY, SY10 7QL
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
Bron y Cul, Moelfre
Date
1 Jun 2011
Current
Potential
37
48
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
1 Jun 2011
37
48
Total Floor Area
109 sq m
Current CO2 Emissions Level
9.9
Potential CO2 Emissions Level
8.1
CO2 per sq m per Year
90
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
2
Address
Bryn Craig, Moelfre
Date
24 Jun 2019
Current
Potential
55
99
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
24 Jun 2019
55
99
2 Apr 2014
51
86
9 Aug 2009
37
66
Total Floor Area
90 sq m
Current CO2 Emissions Level
5.7
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
63
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
PANTYLLYN, C2208 FROM JUNCTION WITH C2210 TO JUNCTION WITH U5142
Date
12 Nov 2020
Current
Potential
45
89
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
12 Nov 2020
45
89
Total Floor Area
177 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
3.5
CO2 per sq m per Year
66
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
4
Address
Penplannau, Moelfre
Date
16 Jun 2011
Current
Potential
45
49
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
16 Jun 2011
45
49
Total Floor Area
201 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
11.0
CO2 per sq m per Year
61
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
2
Address
Penybryn, Moelfre
Date
28 Oct 2010
Current
Potential
35
54
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
28 Oct 2010
35
54
Total Floor Area
85 sq m
Current CO2 Emissions Level
8.0
Potential CO2 Emissions Level
5.3
CO2 per sq m per Year
95
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.