PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Pilgrims Way, ANDOVER, SP10 5HX

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Pilgrims Way, SP10 5HX are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Pilgrims Way, ANDOVER, SP10 5HX
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
253 Pilgrims Way
Date
15 Dec 2017
Current
Potential
62
78
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
15 Dec 2017
62
78
Total Floor Area
87 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
255 Pilgrims Way
Date
29 May 2014
Current
Potential
68
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
29 May 2014
68
83
Total Floor Area
87 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
257 Pilgrims Way
Date
27 Mar 2022
Current
Potential
75
89
Property Type
House
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
27 Mar 2022
75
89
14 Jan 2020
67
86
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
261 Pilgrims Way
Date
18 Jul 2022
Current
Potential
70
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
18 Jul 2022
70
88
Total Floor Area
89 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
262 Pilgrims Way
Date
30 Jun 2014
Current
Potential
67
84
Property Type
House
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
30 Jun 2014
67
84
Total Floor Area
83 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
263 Pilgrims Way
Date
9 Mar 2015
Current
Potential
61
76
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
9 Mar 2015
61
76
Total Floor Area
86 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
265 Pilgrims Way
Date
12 Nov 2022
Current
Potential
73
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
12 Nov 2022
73
87
30 Jun 2013
74
88
Total Floor Area
89 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
268 Pilgrims Way
Date
26 Jan 2017
Current
Potential
60
75
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
26 Jan 2017
60
75
Total Floor Area
86 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
269 Pilgrims Way
Date
26 Jun 2014
Current
Potential
67
82
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
26 Jun 2014
67
82
Total Floor Area
76 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
270 Pilgrims Way
Date
26 Mar 2014
Current
Potential
73
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
26 Mar 2014
73
89
Total Floor Area
76 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
272 Pilgrims Way
Date
15 Jun 2022
Current
Potential
72
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
15 Jun 2022
72
87
19 Jan 2011
75
77
Total Floor Area
78 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
273 Pilgrims Way
Date
9 Mar 2018
Current
Potential
69
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
9 Mar 2018
69
86
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
274 Pilgrims Way
Date
15 Jun 2022
Current
Potential
67
82
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
15 Jun 2022
67
82
15 Apr 2018
68
83
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
275 PILGRIMS WAY, ANDOVER
Date
7 May 2021
Current
Potential
71
86
Property Type
House
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
7 May 2021
71
86
Total Floor Area
74 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
276 Pilgrims Way
Date
15 Jun 2022
Current
Potential
73
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
15 Jun 2022
73
87
Total Floor Area
89 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
277 Pilgrims Way
Date
30 Sep 2014
Current
Potential
57
82
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
30 Sep 2014
57
82
Total Floor Area
88 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
278 Pilgrims Way
Date
23 Sep 2018
Current
Potential
59
78
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
23 Sep 2018
59
78
Total Floor Area
75 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
55
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
279 Pilgrims Way
Date
5 Sep 2010
Current
Potential
61
70
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
5 Sep 2010
61
70
Total Floor Area
77 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
280 Pilgrims Way
Date
22 Mar 2012
Current
Potential
68
69
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
22 Mar 2012
68
69
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
283 Pilgrims Way
Date
1 Jul 2014
Current
Potential
73
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
1 Jul 2014
73
89
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
284 Pilgrims Way
Date
15 Jun 2022
Current
Potential
72
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
15 Jun 2022
72
86
Total Floor Area
78 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
285 Pilgrims Way
Date
19 Jul 2022
Current
Potential
67
83
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
19 Jul 2022
67
83
29 Jul 2015
71
87
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.