PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Mulberry Walk, MAIDENHEAD, SL6 6EU

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Mulberry Walk, SL6 6EU are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Mulberry Walk, MAIDENHEAD, SL6 6EU
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Mulberry Walk
Date
5 Nov 2021
Current
Potential
70
84
Property Type
House
Built Form
End-Terrace
Constructed
1991-1995
+
Certificate History
5 Nov 2021
70
84
6 Jul 2010
73
73
Total Floor Area
80 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
10 Mulberry Walk
Date
21 Dec 2016
Current
Potential
53
85
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
21 Dec 2016
53
85
Total Floor Area
88 sq m
Current CO2 Emissions Level
5.2
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
11 Mulberry Walk
Date
19 Jan 2023
Current
Potential
74
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
19 Jan 2023
74
86
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
12 Mulberry Walk
Date
21 Dec 2016
Current
Potential
62
83
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
21 Dec 2016
62
83
20 Jun 2016
59
86
25 Jan 2024
72
85
Total Floor Area
86 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
13 Mulberry Walk
Date
19 Jan 2023
Current
Potential
72
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
19 Jan 2023
72
86
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
14 Mulberry Walk
Date
4 Jan 2017
Current
Potential
59
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
4 Jan 2017
59
85
19 Mar 2013
75
90
Total Floor Area
79 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
16 Mulberry Walk
Date
20 Dec 2016
Current
Potential
62
85
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
20 Dec 2016
62
85
25 Jan 2024
72
86
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
18 Mulberry Walk
Date
4 Jan 2017
Current
Potential
64
84
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
4 Jan 2017
64
84
25 Jan 2024
73
86
Total Floor Area
88 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
2 Mulberry Walk
Date
21 Dec 2016
Current
Potential
62
84
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
21 Dec 2016
62
84
25 Jan 2024
72
85
Total Floor Area
74 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
20 Mulberry Walk
Date
20 Dec 2016
Current
Potential
64
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
20 Dec 2016
64
86
25 Jan 2024
74
86
Total Floor Area
88 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
21 Mulberry Walk
Date
19 Jan 2023
Current
Potential
73
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
19 Jan 2023
73
87
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
22 Mulberry Walk
Date
4 Jan 2017
Current
Potential
69
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
4 Jan 2017
69
85
30 Jan 2013
73
88
25 Jan 2024
74
86
Total Floor Area
88 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
23 Mulberry Walk
Date
19 Jan 2023
Current
Potential
71
85
Property Type
House
Built Form
End-Terrace
Constructed
1991-1995
+
Certificate History
19 Jan 2023
71
85
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
24 Mulberry Walk
Date
4 Jan 2017
Current
Potential
55
85
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
4 Jan 2017
55
85
6 Aug 2012
67
87
Total Floor Area
88 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
58
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
26 Mulberry Walk
Date
20 Dec 2016
Current
Potential
52
85
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
20 Dec 2016
52
85
25 Jan 2024
72
85
Total Floor Area
87 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
61
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
27 Mulberry Walk
Date
21 Feb 2023
Current
Potential
70
84
Property Type
House
Built Form
Semi-Detached
Constructed
1983-1990
+
Certificate History
21 Feb 2023
70
84
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
28 Mulberry Walk
Date
20 Dec 2016
Current
Potential
59
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
20 Dec 2016
59
87
25 Jan 2024
74
87
Total Floor Area
76 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
29 Mulberry Walk
Date
6 Apr 2016
Current
Potential
70
85
Property Type
House
Built Form
Semi-Detached
Constructed
1991-1995
+
Certificate History
6 Apr 2016
70
85
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
30 Mulberry Walk
Date
20 Dec 2016
Current
Potential
59
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
20 Dec 2016
59
87
Total Floor Area
76 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
32 Mulberry Walk
Date
20 Dec 2016
Current
Potential
62
84
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
20 Dec 2016
62
84
2 Apr 2012
72
87
Total Floor Area
87 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
4 Mulberry Walk
Date
9 Jan 2017
Current
Potential
55
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
9 Jan 2017
55
82
Total Floor Area
76 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
60
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
6 Mulberry Walk
Date
21 Dec 2016
Current
Potential
52
85
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
21 Dec 2016
52
85
25 Jan 2024
72
86
Total Floor Area
74 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
8 Mulberry Walk
Date
21 Dec 2016
Current
Potential
60
83
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
21 Dec 2016
60
83
Total Floor Area
88 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
9 Mulberry Walk
Date
9 Apr 2019
Current
Potential
73
86
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
9 Apr 2019
73
86
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.