PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Whitehouse Mews, WORKSOP, S81 8FB

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Whitehouse Mews, S81 8FB are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Whitehouse Mews, WORKSOP, S81 8FB
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Whitehouse Mews, Blyth
Date
3 Sep 2013
Current
Potential
72
88
Property Type
House
Built Form
Semi-Detached
Constructed
1996-2002
+
Certificate History
3 Sep 2013
72
88
Total Floor Area
66 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
2 Whitehouse Mews, Blyth
Date
18 Jan 2016
Current
Potential
62
82
Property Type
House
Built Form
Semi-Detached
Constructed
1983-1990
+
Certificate History
18 Jan 2016
62
82
Total Floor Area
65 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
4 Whitehouse Mews, Blyth
Date
3 May 2010
Current
Potential
71
74
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
3 May 2010
71
74
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
6 WHITEHOUSE MEWS, BLYTH
Date
13 Jul 2021
Current
Potential
69
82
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
13 Jul 2021
69
82
Total Floor Area
76 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
7 Whitehouse Mews, Blyth
Date
17 Jul 2018
Current
Potential
66
81
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
17 Jul 2018
66
81
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.