PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Stevenson Road, WORKSOP, S81 0DZ

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Stevenson Road, S81 0DZ are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Stevenson Road, WORKSOP, S81 0DZ
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Stevenson Road
Date
27 Feb 2019
Current
Potential
53
85
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
27 Feb 2019
53
85
Total Floor Area
79 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
2 Stevenson Road
Date
20 Nov 2013
Current
Potential
59
82
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
20 Nov 2013
59
82
Total Floor Area
82 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
4 Stevenson Road
Date
7 Sep 2015
Current
Potential
80
86
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
7 Sep 2015
80
86
22 Jul 2014
80
83
Total Floor Area
78 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
6 Stevenson Road
Date
27 Feb 2015
Current
Potential
61
80
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
27 Feb 2015
61
80
24 Sep 2014
62
81
Total Floor Area
103 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
8 Stevenson Road
Date
19 Mar 2014
Current
Potential
75
93
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
19 Mar 2014
75
93
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.