PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
The Crescent, ROTHERHAM, S63 8HS

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for The Crescent, S63 8HS are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for The Crescent, ROTHERHAM, S63 8HS
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 The Crescent, Bolton-Upon-Dearne
Date
27 Jun 2022
Current
Potential
53
84
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
27 Jun 2022
53
84
Total Floor Area
78 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
63
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
12 The Crescent, Bolton-upon-Dearne
Date
25 Jan 2018
Current
Potential
68
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
25 Jan 2018
68
85
Total Floor Area
83 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
13 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
68
83
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
68
83
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
14 The Crescent, Bolton-Upon-Dearne
Date
27 Jun 2023
Current
Potential
67
80
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
27 Jun 2023
67
80
Total Floor Area
73 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
16 The Crescent, Bolton-upon-Dearne
Date
12 May 2013
Current
Potential
46
82
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
12 May 2013
46
82
Total Floor Area
82 sq m
Current CO2 Emissions Level
6.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
78
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
17 The Crescent, Bolton-upon-Dearne
Date
3 May 2016
Current
Potential
70
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
3 May 2016
70
85
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
19 The Crescent, Bolton-Upon-Dearne
Date
12 Aug 2024
Current
Potential
69
83
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
12 Aug 2024
69
83
19 Dec 2011
70
70
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
2 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
68
83
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
68
83
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
20 The Crescent, Bolton-upon-Dearne
Date
5 Jul 2019
Current
Potential
71
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
5 Jul 2019
71
86
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
21 The Crescent, Bolton-upon-Dearne
Date
22 Mar 2016
Current
Potential
72
84
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
22 Mar 2016
72
84
Total Floor Area
114 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
22 The Crescent, Bolton-upon-Dearne
Date
16 Jun 2013
Current
Potential
75
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
16 Jun 2013
75
87
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
27
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
23 The Crescent, Bolton-Upon-Dearne
Date
26 Oct 2022
Current
Potential
65
80
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
26 Oct 2022
65
80
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
25 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
69
84
28 Jan 2011
80
81
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
27 The Crescent, Bolton-Upon-Dearne
Date
9 Sep 2024
Current
Potential
68
82
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
9 Sep 2024
68
82
Total Floor Area
73 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
29 The Crescent, Bolton-Upon-Dearne
Date
12 Aug 2024
Current
Potential
63
83
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
12 Aug 2024
63
83
Total Floor Area
72 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
3 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
69
84
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
31 The Crescent, Bolton-upon-Dearne
Date
19 Aug 2012
Current
Potential
73
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
19 Aug 2012
73
89
Total Floor Area
66 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
33 The Crescent, Bolton-Upon-Dearne
Date
29 Mar 2022
Current
Potential
70
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
29 Mar 2022
70
84
7 Jan 2009
68
78
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
35 The Crescent, Bolton-upon-Dearne
Date
23 Jul 2012
Current
Potential
56
82
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
23 Jul 2012
56
82
Total Floor Area
67 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
37 The Crescent, Bolton-Upon-Dearne
Date
3 Aug 2022
Current
Potential
48
85
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
3 Aug 2022
48
85
Total Floor Area
80 sq m
Current CO2 Emissions Level
5.7
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
71
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
39 The Crescent, Bolton-Upon-Dearne
Date
5 Jan 2024
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
5 Jan 2024
69
84
13 Jun 2012
68
88
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
41 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
69
84
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
43 The Crescent, Bolton-upon-Dearne
Date
18 Sep 2019
Current
Potential
64
83
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
18 Sep 2019
64
83
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
45 The Crescent, Bolton-upon-Dearne
Date
19 Jul 2010
Current
Potential
69
70
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
19 Jul 2010
69
70
Total Floor Area
68 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
47 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
69
84
20 Jul 2009
76
78
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
5 The Crescent, Bolton-Upon-Dearne
Date
11 Oct 2022
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Oct 2022
69
84
21 Jun 2009
74
76
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
7 The Crescent, Bolton-Upon-Dearne
Date
17 Oct 2022
Current
Potential
68
83
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
17 Oct 2022
68
83
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
9 The Crescent, Bolton-upon-Dearne
Date
29 Feb 2012
Current
Potential
72
74
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
29 Feb 2012
72
74
9 Jun 2010
71
75
Total Floor Area
85 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.