PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Hoghton Street, SOUTHPORT, PR9 0TE

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Hoghton Street, PR9 0TE are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Hoghton Street, SOUTHPORT, PR9 0TE
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
66 Marine Gate
Date
11 Jan 2011
Current
Potential
83
86
Property Type
Flat
Built Form
Detached
Constructed
2003-2006
+
Certificate History
11 Jan 2011
83
86
Total Floor Area
78 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
18
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 1 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
49
72
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
49
72
23 Aug 2009
57
75
Total Floor Area
72 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
3.9
CO2 per sq m per Year
54
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 10 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
75
86
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
75
86
23 Aug 2009
67
81
Total Floor Area
70 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 11 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
74
86
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
74
86
23 Aug 2009
66
80
Total Floor Area
79 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 12 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
71
84
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
71
84
23 Aug 2009
65
79
Total Floor Area
79 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
30
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 13 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
74
85
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
74
85
23 Aug 2009
65
79
Total Floor Area
90 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
Apartment 14 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
69
83
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
69
83
23 Aug 2009
61
77
Total Floor Area
89 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
30
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 15 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
60
77
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
60
77
23 Aug 2009
57
75
Total Floor Area
72 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
43
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 16 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
74
85
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
74
85
23 Aug 2009
65
80
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 17 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
75
86
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
75
86
23 Aug 2009
67
81
Total Floor Area
70 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 18 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
74
86
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
74
86
23 Aug 2009
66
80
Total Floor Area
79 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 19 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
71
84
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
71
84
23 Aug 2009
65
79
Total Floor Area
79 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
30
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 2 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
53
74
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
53
74
23 Aug 2009
65
80
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
49
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 20 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
64
80
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
64
80
23 Aug 2009
65
79
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
35
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
Apartment 21 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
59
78
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
59
78
23 Aug 2009
61
77
Total Floor Area
89 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 22 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
63
79
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
63
79
23 Aug 2009
54
74
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
38
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 23 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
65
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
65
81
23 Aug 2009
59
76
Total Floor Area
70 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
38
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 24 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
64
80
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
64
80
23 Aug 2009
58
75
Total Floor Area
79 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
37
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 25, The Edge
Date
26 Mar 2019
Current
Potential
60
78
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
60
78
23 Aug 2009
55
74
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
41
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 3 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
55
76
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
55
76
23 Aug 2009
67
81
Total Floor Area
70 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
48
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 4 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
54
75
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
54
75
23 Aug 2009
66
80
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
3.6
CO2 per sq m per Year
48
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 5 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
61
79
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
61
79
23 Aug 2009
65
79
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 6 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
64
80
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
64
80
23 Aug 2009
65
79
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
35
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
Apartment 7 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
59
78
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
59
78
23 Aug 2009
61
77
Total Floor Area
89 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 8 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
69
82
Property Type
Flat
Built Form
End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
69
82
23 Aug 2009
57
75
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
33
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Apartment 9 The Edge, 7, Hoghton Street
Date
26 Mar 2019
Current
Potential
74
85
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
2003-2006
+
Certificate History
26 Mar 2019
74
85
23 Aug 2009
65
80
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.