PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
St. Marys Road, PRESTON, PR5 6TE

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for St. Marys Road, PR5 6TE are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for St. Marys Road, PRESTON, PR5 6TE
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
36 ST MARYS ROAD, BAMBER BRIDGE
Date
5 Apr 2021
Current
Potential
55
81
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
5 Apr 2021
55
81
Total Floor Area
87 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
58
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
37 St. Marys Road, Bamber Bridge
Date
19 Mar 2015
Current
Potential
64
83
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
19 Mar 2015
64
83
Total Floor Area
157 sq m
Current CO2 Emissions Level
6.9
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
39 St. Marys Road, Bamber Bridge
Date
29 May 2022
Current
Potential
64
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
29 May 2022
64
84
11 Apr 2011
46
53
Total Floor Area
85 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
40 St. Marys Road, Bamber Bridge
Date
27 Jul 2023
Current
Potential
72
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
27 Jul 2023
72
87
14 Aug 2016
62
85
Total Floor Area
76 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
41 St. Marys Road, Bamber Bridge
Date
18 Mar 2019
Current
Potential
72
72
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
18 Mar 2019
72
72
14 Mar 2009
75
78
Total Floor Area
39 sq m
Current CO2 Emissions Level
1.5
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
1
Address
41a St. Marys Road, Bamber Bridge
Date
18 Mar 2019
Current
Potential
45
75
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
18 Mar 2019
45
75
10 Jan 2013
55
67
21 Mar 2009
54
69
Total Floor Area
34 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
86
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
42 St. Marys Road, Bamber Bridge
Date
25 Jun 2020
Current
Potential
59
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
25 Jun 2020
59
82
29 Jan 2010
64
71
Total Floor Area
88 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
44 St. Marys Road, Bamber Bridge
Date
5 Dec 2018
Current
Potential
67
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
5 Dec 2018
67
87
28 Jul 2009
53
67
Total Floor Area
83 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
46 St. Marys Road, Bamber Bridge
Date
4 Jul 2022
Current
Potential
71
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
4 Jul 2022
71
86
6 Jan 2012
65
70
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
48 St. Marys Road, Bamber Bridge
Date
10 Feb 2017
Current
Potential
66
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
10 Feb 2017
66
86
1 Aug 2013
65
88
28 Apr 2013
65
89
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
49 St. Marys Road, Bamber Bridge
Date
8 Nov 2022
Current
Potential
62
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
8 Nov 2022
62
84
20 Oct 2011
61
71
Total Floor Area
87 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
54 St. Marys Road, Bamber Bridge
Date
11 Apr 2016
Current
Potential
65
81
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
11 Apr 2016
65
81
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.