PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Higher Road, PRESTON, PR3 2XY

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Higher Road, PR3 2XY are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Higher Road, PRESTON, PR3 2XY
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
100 GREEN BANK PARK, HIGHER ROAD
Date
4 Dec 2020
Current
Potential
60
68
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
4 Dec 2020
60
68
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
4 GREEN BANK PARK, HIGHER ROAD
Date
10 Mar 2021
Current
Potential
60
83
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
10 Mar 2021
60
83
Total Floor Area
158 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
76 GREEN BANK PARK, HIGHER ROAD
Date
22 Jan 2021
Current
Potential
60
68
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
22 Jan 2021
60
68
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
90 GREEN BANK PARK, HIGHER ROAD
Date
4 Dec 2020
Current
Potential
60
68
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
4 Dec 2020
60
68
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
10 Green Bank Park, Higher Road
Date
21 Feb 2023
Current
Potential
60
69
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
21 Feb 2023
60
69
Total Floor Area
170 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
100 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
102 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
104 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
106 Green Bank Park, Longridge
Date
4 Dec 2018
Current
Potential
60
81
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
4 Dec 2018
60
81
3 Oct 2008
56
57
Total Floor Area
171 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
108 Green Bank Park, Longridge
Date
17 Jun 2019
Current
Potential
57
79
Property Type
Bungalow
Built Form
Detached
Constructed
2003-2006
+
Certificate History
17 Jun 2019
57
79
3 Oct 2008
56
57
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
28
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
12 Green Bank Park, Higher Road
Date
28 Nov 2016
Current
Potential
63
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
28 Nov 2016
63
89
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
14 Green Bank Park, Higher Road
Date
16 Feb 2017
Current
Potential
63
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
16 Feb 2017
63
89
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
16 Green Bank Park, Higher Road
Date
15 Mar 2019
Current
Potential
58
80
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
15 Mar 2019
58
80
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
1
Address
18 Green Bank Park, Higher Road
Date
12 Jun 2016
Current
Potential
59
82
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
12 Jun 2016
59
82
Total Floor Area
163 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
2 Green Bank House, Higher Road
Date
3 Jul 2016
Current
Potential
82
97
Property Type
Bungalow
Built Form
Mid-Terrace
Constructed
2007 onwards
+
Certificate History
3 Jul 2016
82
97
Total Floor Area
218 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
19
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
2 GREEN BANK PARK, HIGHER ROAD
Date
10 May 2024
Current
Potential
64
85
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
10 May 2024
64
85
21 Jun 2021
60
68
Total Floor Area
174 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
20 Green Bank Park, Higher Road
Date
28 Nov 2016
Current
Potential
63
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
28 Nov 2016
63
89
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
22 Green Bank Park, Higher Road
Date
11 Nov 2022
Current
Potential
75
82
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
11 Nov 2022
75
82
Total Floor Area
162 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
28 Green Bank Park, Higher Road
Date
22 May 2023
Current
Potential
77
83
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
22 May 2023
77
83
Total Floor Area
163 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
23
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
3 Green Bank House, Higher Road
Date
3 Jul 2016
Current
Potential
83
95
Property Type
Bungalow
Built Form
End-Terrace
Constructed
2007 onwards
+
Certificate History
3 Jul 2016
83
95
Total Floor Area
298 sq m
Current CO2 Emissions Level
5.2
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
17
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
30 Green Bank Park, Higher Road
Date
22 May 2023
Current
Potential
77
83
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
22 May 2023
77
83
Total Floor Area
163 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
23
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
32 Green Bank Park, Higher Road
Date
17 Apr 2017
Current
Potential
63
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
17 Apr 2017
63
89
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
34 Green Bank Park, Higher Road
Date
22 May 2023
Current
Potential
78
84
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
22 May 2023
78
84
Total Floor Area
163 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
36 Green Bank Park, Higher Road
Date
22 May 2023
Current
Potential
78
84
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
22 May 2023
78
84
Total Floor Area
163 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
38 Green Bank Park, Higher Road
Date
22 May 2023
Current
Potential
78
84
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
22 May 2023
78
84
Total Floor Area
163 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
40 Green Bank Park, Higher Road
Date
2 Oct 2019
Current
Potential
62
70
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
2 Oct 2019
62
70
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
42 Green Bank Park, Higher Road
Date
21 Feb 2023
Current
Potential
60
69
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
21 Feb 2023
60
69
15 Mar 2011
80
80
Total Floor Area
170 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
44 Green Bank Park, Higher Road
Date
21 Feb 2023
Current
Potential
60
69
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
21 Feb 2023
60
69
15 Mar 2011
78
80
Total Floor Area
170 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
46 Green Bank Park, Higher Road
Date
21 Feb 2023
Current
Potential
60
69
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
21 Feb 2023
60
69
15 Mar 2011
79
80
Total Floor Area
170 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
48 Green Bank Park, Higher Road
Date
28 Nov 2016
Current
Potential
63
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
28 Nov 2016
63
89
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
50 Green Bank Park, Higher Road
Date
21 Feb 2023
Current
Potential
60
69
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
21 Feb 2023
60
69
Total Floor Area
170 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
52 Green Bank Park, Higher Road
Date
19 Sep 2021
Current
Potential
60
68
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
19 Sep 2021
60
68
8 Jul 2009
56
58
Total Floor Area
173 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
54 Green Bank Park, Higher Road
Date
4 Dec 2018
Current
Potential
60
82
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
4 Dec 2018
60
82
Total Floor Area
171 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
6 Green Bank Park, Higher Road
Date
8 Feb 2017
Current
Potential
63
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
8 Feb 2017
63
89
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
62 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
64 Green Bank Park, Higher Road
Date
21 May 2020
Current
Potential
60
83
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
21 May 2020
60
83
3 Oct 2008
56
57
Total Floor Area
158 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
66 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
57
58
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
57
58
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
4.3
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
68 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
70 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
72 Green Bank Park, Higher Road
Date
20 May 2020
Current
Potential
60
83
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
20 May 2020
60
83
3 Oct 2008
56
57
Total Floor Area
158 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
74 Green Bank Park, Higher Road
Date
16 Apr 2020
Current
Potential
60
83
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
16 Apr 2020
60
83
3 Oct 2008
56
57
Total Floor Area
158 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
76 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
78 Green Bank Park, Higher Road
Date
22 May 2019
Current
Potential
57
79
Property Type
Bungalow
Built Form
Detached
Constructed
2003-2006
+
Certificate History
22 May 2019
57
79
3 Oct 2008
56
57
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
28
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
8 Green Bank Park, Higher Road
Date
24 Jul 2016
Current
Potential
57
80
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
24 Jul 2016
57
80
Total Floor Area
163 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
29
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
80 Green Bank Park, Higher Road
Date
14 Feb 2020
Current
Potential
60
68
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
14 Feb 2020
60
68
1 Oct 2008
55
57
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
82 Green Bank Park, Longridge
Date
1 Oct 2008
Current
Potential
55
56
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
1 Oct 2008
55
56
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
90 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
55
56
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
55
56
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
92 Green Bank Park, Longridge
Date
3 Oct 2008
Current
Potential
56
57
Property Type
House
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
3 Oct 2008
56
57
Total Floor Area
183 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
94 Green Bank Park, Higher Road
Date
21 Dec 2018
Current
Potential
58
80
Property Type
Bungalow
Built Form
Detached
Constructed
2007 onwards
+
Certificate History
21 Dec 2018
58
80
3 Oct 2008
55
57
Total Floor Area
166 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.