PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
White Cloud Park, SOUTHSEA, PO4 9SS

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for White Cloud Park, PO4 9SS are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for White Cloud Park, SOUTHSEA, PO4 9SS
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 White Cloud Park
Date
17 Feb 2011
Current
Potential
45
63
Property Type
House
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
17 Feb 2011
45
63
Total Floor Area
56 sq m
Current CO2 Emissions Level
5.0
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
89
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
10 WHITE CLOUD PARK, SOUTHSEA
Date
7 Oct 2020
Current
Potential
62
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
7 Oct 2020
62
86
Total Floor Area
84 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
56
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
11 White Cloud Park
Date
25 Feb 2020
Current
Potential
56
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
25 Feb 2020
56
85
Total Floor Area
74 sq m
Current CO2 Emissions Level
5.4
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
73
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Address
12 White Cloud Park
Date
7 May 2018
Current
Potential
50
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
7 May 2018
50
85
Total Floor Area
63 sq m
Current CO2 Emissions Level
5.6
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
88
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Address
14 White Cloud Park
Date
19 Nov 2021
Current
Potential
64
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
19 Nov 2021
64
87
Total Floor Area
62 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
63
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Address
15 White Cloud Park
Date
10 Mar 2019
Current
Potential
49
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
10 Mar 2019
49
86
Total Floor Area
52 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
72
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
16 White Cloud Park
Date
2 Dec 2013
Current
Potential
59
84
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
2 Dec 2013
59
84
Total Floor Area
61 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
82
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
16 WHITE CLOUD PARK, SOUTHSEA
Date
11 Oct 2020
Current
Potential
58
80
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
11 Oct 2020
58
80
Total Floor Area
110 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
59
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
2 White Cloud Park
Date
1 May 2014
Current
Potential
69
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
1 May 2014
69
90
Total Floor Area
70 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
57
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
2 WHITE CLOUD PARK, SOUTHSEA
Date
12 Oct 2020
Current
Potential
45
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
12 Oct 2020
45
79
Total Floor Area
138 sq m
Current CO2 Emissions Level
10.0
Potential CO2 Emissions Level
4.5
CO2 per sq m per Year
73
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
3 White Cloud Park
Date
9 Jun 2011
Current
Potential
67
72
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
9 Jun 2011
67
72
Total Floor Area
58 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
3.8
CO2 per sq m per Year
73
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
4 White Cloud Park
Date
18 Feb 2014
Current
Potential
43
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
18 Feb 2014
43
90
6 Mar 2013
53
84
16 Jan 2009
34
64
Total Floor Area
60 sq m
Current CO2 Emissions Level
5.5
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
91
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
4 WHITE CLOUD PARK, SOUTHSEA
Date
7 Oct 2020
Current
Potential
62
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
7 Oct 2020
62
86
Total Floor Area
84 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
56
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
5 White Cloud Park
Date
17 Sep 2019
Current
Potential
49
82
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
17 Sep 2019
49
82
30 Aug 2016
35
80
Total Floor Area
65 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
59
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
1
Address
6 White Cloud Park
Date
6 Sep 2022
Current
Potential
61
84
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
6 Sep 2022
61
84
Total Floor Area
70 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
65
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
7 White Cloud Park
Date
2 Aug 2012
Current
Potential
67
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
2 Aug 2012
67
85
Total Floor Area
80 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
56
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
8 White Cloud Park
Date
6 Jul 2022
Current
Potential
55
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
6 Jul 2022
55
86
2 Jun 2011
59
67
Total Floor Area
102 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
64
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.