PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Poplar Avenue, PERTH, PH2 9FJ

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Poplar Avenue, PH2 9FJ are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Poplar Avenue, PERTH, PH2 9FJ
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 POPLAR AVENUE , BRIDGE OF EARN
Date
5 Mar 2021
Current
Potential
78
90
Property Type
House
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
5 Mar 2021
78
90
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
10 Poplar Avenue , Bridge Of Earn
Date
29 Jan 2018
Current
Potential
78
91
Property Type
House
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
29 Jan 2018
78
91
Total Floor Area
90 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
13 Poplar Avenue , Bridge Of Earn
Date
3 Mar 2016
Current
Potential
79
88
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
3 Mar 2016
79
88
Total Floor Area
120 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
16 Poplar Avenue , Bridge Of Earn
Date
2 Nov 2015
Current
Potential
78
89
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
2 Nov 2015
78
89
Total Floor Area
117 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
17 Poplar Avenue , Bridge Of Earn
Date
14 Feb 2018
Current
Potential
79
88
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
14 Feb 2018
79
88
Total Floor Area
118 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
19 Poplar Avenue , Bridge Of Earn
Date
17 May 2015
Current
Potential
77
88
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
17 May 2015
77
88
18 May 2015
77
88
16 May 2015
77
88
Total Floor Area
121 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
0
Address
2 Poplar Avenue , Bridge Of Earn
Date
12 Jun 2017
Current
Potential
77
88
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
12 Jun 2017
77
88
11 Jun 2017
77
88
10 Jun 2017
77
88
Total Floor Area
132 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
0
Address
20 Poplar Avenue , Bridge Of Earn
Date
22 Oct 2017
Current
Potential
78
89
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
22 Oct 2017
78
89
23 Oct 2017
78
89
21 Oct 2017
78
89
Total Floor Area
117 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
2
Address
23 POPLAR AVENUE , BRIDGE OF EARN
Date
5 Jun 2023
Current
Potential
80
89
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
5 Jun 2023
80
89
6 Jun 2023
80
89
Total Floor Area
126 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
2
Address
24 POPLAR AVENUE , BRIDGE OF EARN
Date
28 Jul 2022
Current
Potential
79
91
Property Type
House
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
28 Jul 2022
79
91
29 Jul 2022
79
91
27 Jul 2022
79
91
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
28 POPLAR AVENUE , BRIDGE OF EARN
Date
13 Mar 2024
Current
Potential
80
91
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
13 Mar 2024
80
91
Total Floor Area
90 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
29a Poplar Avenue , Bridge Of Earn
Date
3 Aug 2015
Current
Potential
79
90
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
3 Aug 2015
79
90
16 Apr 2024
80
91
4 Aug 2015
79
90
2 Aug 2015
79
90
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
29B POPLAR AVENUE , BRIDGE OF EARN
Date
27 Mar 2019
Current
Potential
79
91
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
27 Mar 2019
79
91
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
3 Poplar Avenue , Bridge Of Earn
Date
20 Feb 2015
Current
Potential
79
92
Property Type
House
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
20 Feb 2015
79
92
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
31A POPLAR AVENUE , BRIDGE OF EARN
Date
19 Jul 2024
Current
Potential
80
91
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
19 Jul 2024
80
91
18 Aug 2019
80
91
17 Aug 2019
80
91
19 Aug 2019
80
91
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
32 POPLAR AVENUE , BRIDGE OF EARN
Date
7 Feb 2023
Current
Potential
81
93
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
7 Feb 2023
81
93
22 Jul 2019
80
92
Total Floor Area
77 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Address
35 POPLAR AVENUE , BRIDGE OF EARN
Date
7 Jul 2023
Current
Potential
80
91
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
7 Jul 2023
80
91
6 Jul 2023
80
91
16 Sep 2019
79
90
Total Floor Area
89 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
4 Poplar Avenue , Bridge Of Earn
Date
27 Mar 2014
Current
Potential
78
88
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
27 Mar 2014
78
88
Total Floor Area
120 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
41 POPLAR AVENUE , BRIDGE OF EARN
Date
17 Jun 2018
Current
Potential
81
92
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
17 Jun 2018
81
92
18 Jun 2018
81
92
16 Jun 2018
81
92
Total Floor Area
90 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
47 Poplar Avenue , Bridge Of Earn
Date
5 May 2015
Current
Potential
78
90
Property Type
Bungalow
Built Form
Detached
Constructed
N/A
+
Certificate History
5 May 2015
78
90
4 May 2015
78
90
3 May 2015
78
90
Total Floor Area
95 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
53 POPLAR AVENUE , BRIDGE OF EARN
Date
17 Mar 2023
Current
Potential
80
91
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
17 Mar 2023
80
91
18 Jan 2019
79
91
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
6 Poplar Avenue , Bridge Of Earn
Date
26 Aug 2014
Current
Potential
79
89
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
26 Aug 2014
79
89
25 Aug 2014
79
89
24 Aug 2014
79
89
Total Floor Area
125 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
23
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
7 Poplar Avenue , Bridge Of Earn
Date
22 Mar 2017
Current
Potential
77
88
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
22 Mar 2017
77
88
Total Floor Area
124 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Address
8 POPLAR AVENUE , BRIDGE OF EARN
Date
23 Jan 2024
Current
Potential
80
87
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
23 Jan 2024
80
87
Total Floor Area
155 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
9 Poplar Avenue , Bridge Of Earn
Date
19 Mar 2015
Current
Potential
78
89
Property Type
House
Built Form
Detached
Constructed
2008 onwards
+
Certificate History
19 Mar 2015
78
89
Total Floor Area
108 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.