PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Copsey Walk, DEREHAM, NR19 1WP

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Copsey Walk, NR19 1WP are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Copsey Walk, DEREHAM, NR19 1WP
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Copsey Walk
Date
8 Apr 2012
Current
Potential
84
85
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
8 Apr 2012
84
85
Total Floor Area
88 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
14
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
10 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
64 sq m
Current CO2 Emissions Level
1.4
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
11 Copsey Walk
Date
4 Mar 2020
Current
Potential
78
90
Property Type
House
Built Form
End-Terrace
Constructed
2007 onwards
+
Certificate History
4 Mar 2020
78
90
28 Feb 2010
84
84
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
12 Copsey Walk
Date
14 Jan 2011
Current
Potential
85
86
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
14 Jan 2011
85
86
28 Feb 2010
86
86
Total Floor Area
64 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
13 Copsey Walk
Date
28 Feb 2010
Current
Potential
82
82
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
28 Feb 2010
82
82
Total Floor Area
120 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
14 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
64 sq m
Current CO2 Emissions Level
1.4
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
14 COPSEY WALK, DEREHAM
Date
29 Dec 2020
Current
Potential
76
92
Property Type
House
Built Form
End-Terrace
Constructed
2007-2011
+
Certificate History
29 Dec 2020
76
92
Total Floor Area
62 sq m
Current CO2 Emissions Level
1.8
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
15 Copsey Walk
Date
28 Feb 2010
Current
Potential
82
82
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
28 Feb 2010
82
82
Total Floor Area
120 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
16 Copsey Walk
Date
13 Jan 2012
Current
Potential
80
80
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
13 Jan 2012
80
80
Total Floor Area
83 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
21
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
17 Copsey Walk
Date
6 Oct 2011
Current
Potential
79
79
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
6 Oct 2011
79
79
Total Floor Area
83 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
18 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
82 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
19 Copsey Walk
Date
21 Jan 2020
Current
Potential
76
91
Property Type
House
Built Form
Mid-Terrace
Constructed
2007 onwards
+
Certificate History
21 Jan 2020
76
91
28 Feb 2010
84
84
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
2 Copsey Walk
Date
28 Feb 2010
Current
Potential
83
83
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
28 Feb 2010
83
83
Total Floor Area
120 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
20 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
69 sq m
Current CO2 Emissions Level
1.5
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
20 COPSEY WALK, DEREHAM
Date
7 Dec 2020
Current
Potential
78
91
Property Type
House
Built Form
End-Terrace
Constructed
2007-2011
+
Certificate History
7 Dec 2020
78
91
Total Floor Area
68 sq m
Current CO2 Emissions Level
1.8
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
26
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
21 Copsey Walk
Date
6 Oct 2011
Current
Potential
81
81
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
6 Oct 2011
81
81
Total Floor Area
73 sq m
Current CO2 Emissions Level
1.4
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
19
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
22 Copsey Walk
Date
3 Oct 2021
Current
Potential
77
91
Property Type
House
Built Form
Mid-Terrace
Constructed
2007-2011
+
Certificate History
3 Oct 2021
77
91
28 Feb 2010
86
86
Total Floor Area
62 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
0.5
CO2 per sq m per Year
27
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
23 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
82 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
24 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
82 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
26 Copsey Walk
Date
28 Feb 2010
Current
Potential
84
84
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
28 Feb 2010
84
84
Total Floor Area
120 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
18
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
3 Copsey Walk
Date
8 Apr 2012
Current
Potential
84
85
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
8 Apr 2012
84
85
Total Floor Area
88 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
14
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
4 Copsey Walk
Date
28 Feb 2010
Current
Potential
83
83
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
28 Feb 2010
83
83
Total Floor Area
88 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
22
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
5 Copsey Walk
Date
27 Apr 2023
Current
Potential
79
89
Property Type
House
Built Form
End-Terrace
Constructed
2007-2011
+
Certificate History
27 Apr 2023
79
89
31 Jul 2011
81
81
Total Floor Area
117 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
22
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
6 Copsey Walk
Date
28 Feb 2010
Current
Potential
83
83
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
28 Feb 2010
83
83
Total Floor Area
106 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
19
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
6 COPSEY WALK, DEREHAM
Date
6 Apr 2021
Current
Potential
72
84
Property Type
House
Built Form
Semi-Detached
Constructed
2007-2011
+
Certificate History
6 Apr 2021
72
84
Total Floor Area
112 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
7 Copsey Walk
Date
7 Dec 2023
Current
Potential
78
92
Property Type
House
Built Form
Mid-Terrace
Constructed
2007-2011
+
Certificate History
7 Dec 2023
78
92
28 Feb 2010
86
86
Total Floor Area
60 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
26
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
8 Copsey Walk
Date
30 Nov 2021
Current
Potential
77
88
Property Type
House
Built Form
Semi-Detached
Constructed
2007-2011
+
Certificate History
30 Nov 2021
77
88
28 Feb 2010
84
84
Total Floor Area
87 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
26
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
9 Copsey Walk
Date
28 Feb 2010
Current
Potential
86
86
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
28 Feb 2010
86
86
Total Floor Area
64 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
19
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.