PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Cheyne Walk, KETTERING, NN15 7EE

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Cheyne Walk, NN15 7EE are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Cheyne Walk, KETTERING, NN15 7EE
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
101 Cheyne Walk
Date
5 Jun 2013
Current
Potential
66
83
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
5 Jun 2013
66
83
Total Floor Area
93 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
2
Address
103 Cheyne Walk
Date
18 Oct 2009
Current
Potential
67
76
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
18 Oct 2009
67
76
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
105 Cheyne Walk
Date
4 Nov 2014
Current
Potential
68
81
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
4 Nov 2014
68
81
18 May 2010
72
74
Total Floor Area
100 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
107 Cheyne Walk
Date
14 Nov 2023
Current
Potential
67
82
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
14 Nov 2023
67
82
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
111 Cheyne Walk
Date
29 Apr 2024
Current
Potential
67
80
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
29 Apr 2024
67
80
Total Floor Area
113 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
3
Address
113 Cheyne Walk
Date
4 Sep 2024
Current
Potential
70
83
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
4 Sep 2024
70
83
10 Oct 2023
56
83
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
119 Cheyne Walk
Date
6 Dec 2011
Current
Potential
59
70
Property Type
House
Built Form
Semi-Detached
Constructed
1967-1975
+
Certificate History
6 Dec 2011
59
70
Total Floor Area
94 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
121 Cheyne Walk
Date
27 Sep 2016
Current
Potential
57
83
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
27 Sep 2016
57
83
Total Floor Area
111 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
85 Cheyne Walk
Date
3 Dec 2009
Current
Potential
61
69
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
3 Dec 2009
61
69
Total Floor Area
169 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
5.2
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
87 Cheyne Walk
Date
4 Jun 2020
Current
Potential
71
82
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
4 Jun 2020
71
82
Total Floor Area
120 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
89 Cheyne Walk
Date
6 Feb 2018
Current
Potential
45
83
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
6 Feb 2018
45
83
Total Floor Area
98 sq m
Current CO2 Emissions Level
7.3
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
74
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
93 Cheyne Walk
Date
6 Feb 2015
Current
Potential
56
87
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
6 Feb 2015
56
87
Total Floor Area
85 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
60
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.