PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Blair Court, NOTTINGHAM, NG2 2NB

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Blair Court, NG2 2NB are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Blair Court, NOTTINGHAM, NG2 2NB
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Blair Court
Date
15 Feb 2010
Current
Potential
75
81
Property Type
Maisonette
Built Form
Detached
Constructed
1976-1982
+
Certificate History
15 Feb 2010
75
81
28 Jan 2010
72
78
Total Floor Area
76 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
10 Blair Court
Date
3 Apr 2012
Current
Potential
68
79
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
3 Apr 2012
68
79
15 Feb 2010
75
80
Total Floor Area
49 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
12 Blair Court
Date
9 May 2023
Current
Potential
67
69
Property Type
Maisonette
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
9 May 2023
67
69
5 May 2013
63
75
Total Floor Area
74 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
2 Blair Court
Date
3 Feb 2022
Current
Potential
71
75
Property Type
Flat
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
3 Feb 2022
71
75
3 Apr 2012
68
78
15 Feb 2010
76
81
9 Feb 2009
68
78
Total Floor Area
49 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
1
Address
3 Blair Court
Date
3 Apr 2012
Current
Potential
69
79
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
3 Apr 2012
69
79
15 Feb 2010
72
79
Total Floor Area
50 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
5 Blair Court
Date
12 Jul 2018
Current
Potential
74
77
Property Type
Maisonette
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
12 Jul 2018
74
77
3 Apr 2012
49
68
15 Feb 2010
77
82
7 Oct 2008
72
78
Total Floor Area
80 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
6 Blair Court
Date
3 Apr 2012
Current
Potential
63
79
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
3 Apr 2012
63
79
15 Feb 2010
74
80
Total Floor Area
49 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
7 Blair Court
Date
3 Oct 2011
Current
Potential
66
68
Property Type
Maisonette
Built Form
Detached
Constructed
1967-1975
+
Certificate History
3 Oct 2011
66
68
Total Floor Area
51 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
8 Blair Court
Date
21 Jul 2018
Current
Potential
80
80
Property Type
Maisonette
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
21 Jul 2018
80
80
3 Apr 2012
37
68
15 Feb 2010
75
81
Total Floor Area
80 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
21
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
9 Blair Court
Date
3 Apr 2012
Current
Potential
65
77
Property Type
Maisonette
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
3 Apr 2012
65
77
23 Feb 2010
75
83
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.