PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Alston Avenue, NEWCASTLE UPON TYNE, NE6 4BB

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Alston Avenue, NE6 4BB are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Alston Avenue, NEWCASTLE UPON TYNE, NE6 4BB
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
22 Alston Avenue
Date
27 Mar 2024
Current
Potential
73
73
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
27 Mar 2024
73
73
13 Mar 2024
74
74
22 Jul 2014
69
83
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
29
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
24 Alston Avenue
Date
19 Mar 2024
Current
Potential
74
74
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
19 Mar 2024
74
74
21 Feb 2024
74
74
29 Jan 2015
73
77
4 Aug 2014
58
81
4 Aug 2014
70
83
18 Jun 2012
74
86
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
28
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
26 Alston Avenue
Date
27 Mar 2024
Current
Potential
72
72
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
27 Mar 2024
72
72
21 Feb 2024
73
73
21 Aug 2014
56
79
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
31
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
28 Alston Avenue
Date
27 Mar 2024
Current
Potential
74
74
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
27 Mar 2024
74
74
21 Feb 2024
74
74
31 Jul 2014
58
82
25 Jun 2012
66
79
Total Floor Area
87 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
29
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
30 Alston Avenue
Date
27 Mar 2024
Current
Potential
74
74
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
27 Mar 2024
74
74
27 Feb 2024
75
75
5 Aug 2014
63
85
Total Floor Area
87 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
28
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
32 Alston Avenue
Date
11 Aug 2014
Current
Potential
61
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
11 Aug 2014
61
85
11 Aug 2014
63
83
Total Floor Area
91 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
34 Alston Avenue
Date
30 Jul 2014
Current
Potential
42
83
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
30 Jul 2014
42
83
Total Floor Area
91 sq m
Current CO2 Emissions Level
7.2
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
79
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
36 Alston Avenue
Date
27 Mar 2024
Current
Potential
73
73
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
27 Mar 2024
73
73
21 Feb 2024
74
74
Total Floor Area
75 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
31
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
38 Alston Avenue
Date
21 Feb 2024
Current
Potential
74
74
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
21 Feb 2024
74
74
7 Aug 2014
62
83
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
28
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
42 Alston Avenue
Date
1 Mar 2022
Current
Potential
64
78
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
1 Mar 2022
64
78
3 Aug 2014
60
81
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.