PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
West Walk, MAIDSTONE, ME16 8TP

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for West Walk, ME16 8TP are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for West Walk, MAIDSTONE, ME16 8TP
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 West Walk
Date
3 Sep 2020
Current
Potential
27
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
3 Sep 2020
27
88
Total Floor Area
91 sq m
Current CO2 Emissions Level
8.8
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
97
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
11 West Walk
Date
6 Dec 2021
Current
Potential
51
70
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
6 Dec 2021
51
70
Total Floor Area
92 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
57
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
13 West Walk
Date
18 Jul 2021
Current
Potential
44
84
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
18 Jul 2021
44
84
Total Floor Area
92 sq m
Current CO2 Emissions Level
6.2
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
67
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
15 West Walk
Date
29 Oct 2024
Current
Potential
69
86
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
29 Oct 2024
69
86
12 Jul 2014
61
77
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
16 West Walk
Date
29 Sep 2016
Current
Potential
60
83
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
29 Sep 2016
60
83
Total Floor Area
91 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
2 West Walk
Date
11 Aug 2016
Current
Potential
66
86
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
11 Aug 2016
66
86
Total Floor Area
105 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
4 West Walk
Date
7 Jan 2022
Current
Potential
67
85
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
7 Jan 2022
67
85
Total Floor Area
92 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
5 West Walk
Date
28 Feb 2023
Current
Potential
61
85
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
28 Feb 2023
61
85
Total Floor Area
75 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
6 West Walk
Date
22 Mar 2022
Current
Potential
68
83
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
22 Mar 2022
68
83
5 Mar 2009
61
63
Total Floor Area
76 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
7 West Walk
Date
12 Jan 2022
Current
Potential
57
76
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
12 Jan 2022
57
76
Total Floor Area
88 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
55
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
8 West Walk
Date
7 Jan 2022
Current
Potential
59
76
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
7 Jan 2022
59
76
Total Floor Area
88 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.