PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Hollyhedge Road, MANCHESTER, M22 8LR

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Hollyhedge Road, M22 8LR are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Hollyhedge Road, MANCHESTER, M22 8LR
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
101 Hollyhedge Road
Date
13 Apr 2022
Current
Potential
59
75
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
13 Apr 2022
59
75
25 Oct 2012
66
82
Total Floor Area
72 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
103 Hollyhedge Road
Date
19 Jun 2018
Current
Potential
69
86
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
19 Jun 2018
69
86
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
105 Hollyhedge Road
Date
19 Jul 2017
Current
Potential
64
86
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
19 Jul 2017
64
86
1 Oct 2014
48
76
30 Nov 2013
51
76
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
107 Hollyhedge Road
Date
3 Jan 2018
Current
Potential
70
85
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
3 Jan 2018
70
85
20 Apr 2009
65
75
Total Floor Area
75 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
109 Hollyhedge Road
Date
5 Sep 2017
Current
Potential
65
81
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
5 Sep 2017
65
81
4 Feb 2014
68
84
Total Floor Area
72 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
111 Hollyhedge Road
Date
13 Jul 2021
Current
Potential
69
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
13 Jul 2021
69
87
Total Floor Area
73 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
115 Hollyhedge Road
Date
17 Mar 2023
Current
Potential
64
79
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
17 Mar 2023
64
79
5 Sep 2017
70
85
3 Sep 2014
69
84
Total Floor Area
75 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
117 Hollyhedge Road
Date
6 Jun 2019
Current
Potential
69
84
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
6 Jun 2019
69
84
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
119 Hollyhedge Road
Date
15 Oct 2014
Current
Potential
63
85
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
15 Oct 2014
63
85
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
65 Hollyhedge Road
Date
23 May 2016
Current
Potential
60
85
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
23 May 2016
60
85
28 Mar 2016
60
84
Total Floor Area
70 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
67 Hollyhedge Road
Date
26 May 2016
Current
Potential
66
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
26 May 2016
66
87
Total Floor Area
66 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
69 Hollyhedge Road
Date
7 Sep 2023
Current
Potential
71
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
7 Sep 2023
71
87
18 Jun 2018
70
87
5 Sep 2017
67
82
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
3
Address
71 Hollyhedge Road
Date
13 Apr 2022
Current
Potential
66
81
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
13 Apr 2022
66
81
7 Apr 2022
72
86
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
73 Hollyhedge Road
Date
20 Jul 2014
Current
Potential
54
82
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
20 Jul 2014
54
82
Total Floor Area
71 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
79 Hollyhedge Road
Date
17 Nov 2022
Current
Potential
67
82
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
17 Nov 2022
67
82
5 Sep 2017
56
73
Total Floor Area
75 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
81 HOLLYHEDGE ROAD, MANCHESTER
Date
15 Dec 2020
Current
Potential
71
85
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
15 Dec 2020
71
85
Total Floor Area
73 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
83 Hollyhedge Road
Date
19 Jun 2018
Current
Potential
69
86
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
19 Jun 2018
69
86
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
85 HOLLYHEDGE ROAD, MANCHESTER
Date
17 Dec 2020
Current
Potential
76
78
Property Type
Flat
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
17 Dec 2020
76
78
Total Floor Area
72 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
27
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
87 Hollyhedge Road
Date
17 Mar 2023
Current
Potential
70
75
Property Type
Flat
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
17 Mar 2023
70
75
11 Sep 2017
68
73
5 Mar 2013
69
74
Total Floor Area
64 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
89 Hollyhedge Road
Date
18 Apr 2022
Current
Potential
73
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
18 Apr 2022
73
87
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
91 Hollyhedge Road
Date
15 Dec 2017
Current
Potential
65
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
15 Dec 2017
65
82
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
93 Hollyhedge Road
Date
2 Oct 2022
Current
Potential
75
78
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
2 Oct 2022
75
78
5 Jan 2018
71
75
10 Nov 2016
70
74
21 May 2012
71
76
Total Floor Area
65 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
95 Hollyhedge Road
Date
27 Sep 2023
Current
Potential
76
76
Property Type
Flat
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
27 Sep 2023
76
76
5 Jan 2018
74
76
11 Sep 2017
72
74
17 Apr 2013
72
74
4 Jul 2011
64
76
Total Floor Area
66 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
97 Hollyhedge Road
Date
23 Mar 2012
Current
Potential
68
68
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
23 Mar 2012
68
68
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
97 HOLLYHEDGE ROAD, MANCHESTER
Date
15 Dec 2020
Current
Potential
71
85
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
15 Dec 2020
71
85
Total Floor Area
73 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.