PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Laundon Way, LEICESTER, LE6 0YG

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Laundon Way, LE6 0YG are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Laundon Way, LEICESTER, LE6 0YG
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
20 Laundon Way, Groby
Date
20 Jun 2011
Current
Potential
59
71
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
20 Jun 2011
59
71
Total Floor Area
95 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
26 Laundon Way, Groby
Date
28 Jan 2022
Current
Potential
71
85
Property Type
House
Built Form
Detached
Constructed
1976-1982
+
Certificate History
28 Jan 2022
71
85
15 Mar 2010
59
70
Total Floor Area
79 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
3 Laundon Way, Groby
Date
5 Apr 2009
Current
Potential
55
61
Property Type
House
Built Form
Detached
Constructed
1983-1990
+
Certificate History
5 Apr 2009
55
61
Total Floor Area
135 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
4.7
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
5 Laundon Way, Groby
Date
6 Jul 2016
Current
Potential
62
80
Property Type
House
Built Form
Detached
Constructed
1983-1990
+
Certificate History
6 Jul 2016
62
80
20 Feb 2013
55
80
Total Floor Area
128 sq m
Current CO2 Emissions Level
5.5
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
2
Address
7 Laundon Way, Groby
Date
5 Jan 2012
Current
Potential
63
65
Property Type
House
Built Form
Detached
Constructed
1983-1990
+
Certificate History
5 Jan 2012
63
65
Total Floor Area
108 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
3.9
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.