PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Pindar Road, LEICESTER, LE3 9RN

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Pindar Road, LE3 9RN are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Pindar Road, LEICESTER, LE3 9RN
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
11 Pindar Road
Date
30 Mar 2022
Current
Potential
70
84
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
30 Mar 2022
70
84
8 Mar 2014
48
84
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
13 Pindar Road
Date
3 Dec 2013
Current
Potential
70
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
3 Dec 2013
70
86
30 Nov 2013
68
86
Total Floor Area
100 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
15 Pindar Road
Date
4 Sep 2020
Current
Potential
58
78
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
4 Sep 2020
58
78
Total Floor Area
78 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
63
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
17 Pindar Road
Date
21 Jan 2016
Current
Potential
78
91
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
21 Jan 2016
78
91
Total Floor Area
108 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
19 Pindar Road
Date
22 Nov 2012
Current
Potential
60
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
22 Nov 2012
60
87
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
21 Pindar Road
Date
26 Aug 2013
Current
Potential
49
86
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
26 Aug 2013
49
86
Total Floor Area
79 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
67
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
23 Pindar Road
Date
22 Feb 2018
Current
Potential
70
84
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
22 Feb 2018
70
84
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
29 Pindar Road
Date
20 May 2012
Current
Potential
92
96
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
20 May 2012
92
96
Total Floor Area
76 sq m
Current CO2 Emissions Level
0.7
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
10
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
31 Pindar Road
Date
11 Apr 2024
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Apr 2024
69
84
31 Jan 2023
71
83
30 Sep 2008
67
75
Total Floor Area
94 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
33 Pindar Road
Date
31 Aug 2011
Current
Potential
57
70
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
31 Aug 2011
57
70
Total Floor Area
78 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
56
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
41 Pindar Road
Date
3 Mar 2023
Current
Potential
63
82
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
3 Mar 2023
63
82
21 Feb 2014
78
91
Total Floor Area
77 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
52
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
43 Pindar Road
Date
20 Jan 2011
Current
Potential
73
73
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
20 Jan 2011
73
73
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
45 Pindar Road
Date
10 Apr 2024
Current
Potential
73
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
10 Apr 2024
73
85
16 Jun 2015
70
84
Total Floor Area
95 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
47 Pindar Road
Date
22 Nov 2012
Current
Potential
61
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
22 Nov 2012
61
86
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
49 Pindar Road
Date
5 Aug 2015
Current
Potential
79
89
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
5 Aug 2015
79
89
24 Oct 2014
74
86
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
51 Pindar Road
Date
15 Nov 2013
Current
Potential
61
86
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
15 Nov 2013
61
86
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
53 Pindar Road
Date
31 Oct 2008
Current
Potential
63
76
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
31 Oct 2008
63
76
Total Floor Area
99 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
55 Pindar Road
Date
15 Aug 2017
Current
Potential
81
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
15 Aug 2017
81
84
4 Dec 2012
71
88
Total Floor Area
79 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
59 Pindar Road
Date
10 Jan 2009
Current
Potential
56
76
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
10 Jan 2009
56
76
Total Floor Area
79 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
60
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
61 Pindar Road
Date
28 Nov 2012
Current
Potential
65
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
28 Nov 2012
65
87
Total Floor Area
98 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
63 Pindar Road
Date
16 Jul 2012
Current
Potential
65
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
16 Jul 2012
65
83
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
65 Pindar Road
Date
17 Feb 2014
Current
Potential
81
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
17 Feb 2014
81
87
28 Nov 2012
69
86
Total Floor Area
99 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
22
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
67 Pindar Road
Date
8 Jun 2011
Current
Potential
67
72
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
8 Jun 2011
67
72
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.