PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Abbotshaven, TAIN, IV20 1XY

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Abbotshaven, IV20 1XY are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Abbotshaven, TAIN, IV20 1XY
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
100 ABBOTSHAVEN , BALINTORE
Date
26 Aug 2023
Current
Potential
78
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
26 Aug 2023
78
89
27 Aug 2023
78
89
30 Nov 2022
59
81
Total Floor Area
97 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
104 ABBOTSHAVEN , BALINTORE
Date
24 Nov 2015
Current
Potential
55
73
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
24 Nov 2015
55
73
Total Floor Area
92 sq m
Current CO2 Emissions Level
7.7
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
84
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
12 ABBOTSHAVEN , BALINTORE
Date
22 Jan 2020
Current
Potential
52
104
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
22 Jan 2020
52
104
Total Floor Area
98 sq m
Current CO2 Emissions Level
8.9
Potential CO2 Emissions Level
6.2
CO2 per sq m per Year
91
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
14 ABBOTSHAVEN , BALINTORE
Date
2 Dec 2023
Current
Potential
74
108
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
2 Dec 2023
74
108
17 Jan 2022
55
74
28 Nov 2022
52
99
Total Floor Area
96 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
28
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
16 ABBOTSHAVEN , BALINTORE
Date
12 Aug 2023
Current
Potential
77
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
12 Aug 2023
77
90
11 Aug 2023
77
90
28 Nov 2022
58
82
Total Floor Area
97 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
18 ABBOTSHAVEN , BALINTORE
Date
2 Dec 2022
Current
Potential
48
74
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
2 Dec 2022
48
74
Total Floor Area
97 sq m
Current CO2 Emissions Level
10.0
Potential CO2 Emissions Level
3.6
CO2 per sq m per Year
106
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
2 ABBOTSHAVEN , BALINTORE
Date
23 Sep 2023
Current
Potential
72
87
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
23 Sep 2023
72
87
22 Sep 2023
72
87
1 Dec 2022
54
79
Total Floor Area
96 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
30
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
22 ABBOTSHAVEN , BALINTORE
Date
20 Oct 2016
Current
Potential
63
80
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
20 Oct 2016
63
80
21 Oct 2016
63
80
19 Oct 2016
63
80
Total Floor Area
93 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
41
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
24 ABBOTSHAVEN , BALINTORE
Date
12 Oct 2016
Current
Potential
63
80
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
12 Oct 2016
63
80
11 Oct 2016
63
80
10 Oct 2016
63
80
Total Floor Area
98 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
34 ABBOTSHAVEN , BALINTORE
Date
22 Sep 2023
Current
Potential
76
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
22 Sep 2023
76
88
23 Sep 2023
76
88
30 Nov 2022
56
80
Total Floor Area
96 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
38 ABBOTSHAVEN , BALINTORE
Date
7 Jul 2019
Current
Potential
51
98
Property Type
House
Built Form
End-Terrace
Constructed
1950-1964
+
Certificate History
7 Jul 2019
51
98
8 Jul 2019
51
98
6 Jul 2019
51
98
Total Floor Area
96 sq m
Current CO2 Emissions Level
9.4
Potential CO2 Emissions Level
5.6
CO2 per sq m per Year
98
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
4 ABBOTSHAVEN , BALINTORE
Date
8 Sep 2016
Current
Potential
57
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
8 Sep 2016
57
81
9 Sep 2016
57
81
7 Sep 2016
57
81
Total Floor Area
94 sq m
Current CO2 Emissions Level
8.1
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
86
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
40 ABBOTSHAVEN , BALINTORE
Date
17 Jan 2022
Current
Potential
63
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
17 Jan 2022
63
79
Total Floor Area
98 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
75
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
42 ABBOTSHAVEN , BALINTORE
Date
22 Sep 2023
Current
Potential
75
88
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
22 Sep 2023
75
88
23 Sep 2023
75
88
2 Dec 2022
54
79
Total Floor Area
106 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
44 ABBOTSHAVEN , BALINTORE
Date
26 Jan 2018
Current
Potential
65
82
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
26 Jan 2018
65
82
Total Floor Area
92 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
38
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
48 ABBOTSHAVEN , BALINTORE
Date
30 Nov 2022
Current
Potential
56
80
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
30 Nov 2022
56
80
Total Floor Area
96 sq m
Current CO2 Emissions Level
8.8
Potential CO2 Emissions Level
3.6
CO2 per sq m per Year
91
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
50 ABBOTSHAVEN , BALINTORE
Date
24 Apr 2019
Current
Potential
46
100
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
24 Apr 2019
46
100
25 Apr 2019
46
100
23 Apr 2019
46
100
Total Floor Area
89 sq m
Current CO2 Emissions Level
9.1
Potential CO2 Emissions Level
5.6
CO2 per sq m per Year
102
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
52 ABBOTSHAVEN , BALINTORE
Date
23 Sep 2023
Current
Potential
74
87
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
23 Sep 2023
74
87
22 Sep 2023
74
87
29 Nov 2022
52
78
Total Floor Area
106 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
54 ABBOTSHAVEN , BALINTORE
Date
1 Dec 2022
Current
Potential
55
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
1 Dec 2022
55
79
Total Floor Area
106 sq m
Current CO2 Emissions Level
9.7
Potential CO2 Emissions Level
4.1
CO2 per sq m per Year
91
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
56 ABBOTSHAVEN , BALINTORE
Date
23 Sep 2023
Current
Potential
76
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
23 Sep 2023
76
88
22 Sep 2023
76
88
28 Nov 2022
55
80
Total Floor Area
106 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
58 ABBOTSHAVEN , BALINTORE
Date
30 May 2019
Current
Potential
54
94
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
30 May 2019
54
94
29 May 2019
54
94
28 May 2019
54
94
Total Floor Area
96 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
3.9
CO2 per sq m per Year
51
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
6 ABBOTSHAVEN , BALINTORE
Date
15 Dec 2023
Current
Potential
75
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
15 Dec 2023
75
88
Total Floor Area
107 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
60 ABBOTSHAVEN , BALINTORE
Date
19 Sep 2019
Current
Potential
62
81
Property Type
House
Built Form
Semi-Detached
Constructed
1965-1975
+
Certificate History
19 Sep 2019
62
81
18 Sep 2019
62
81
17 Sep 2019
62
81
Total Floor Area
92 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
41
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Address
64 ABBOTSHAVEN , BALINTORE
Date
5 Oct 2016
Current
Potential
62
80
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
5 Oct 2016
62
80
6 Oct 2016
62
80
4 Oct 2016
62
80
Total Floor Area
98 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
66 ABBOTSHAVEN , BALINTORE
Date
30 Nov 2022
Current
Potential
54
78
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
30 Nov 2022
54
78
Total Floor Area
106 sq m
Current CO2 Emissions Level
9.8
Potential CO2 Emissions Level
3.9
CO2 per sq m per Year
93
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
74 ABBOTSHAVEN , BALINTORE
Date
4 Oct 2023
Current
Potential
72
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
4 Oct 2023
72
87
3 Oct 2023
72
87
1 Dec 2022
49
78
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
31
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
8 ABBOTSHAVEN , BALINTORE
Date
22 Sep 2023
Current
Potential
78
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
22 Sep 2023
78
89
23 Sep 2023
78
89
29 Nov 2022
33
82
Total Floor Area
97 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
80 ABBOTSHAVEN , BALINTORE
Date
30 Sep 2023
Current
Potential
75
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
30 Sep 2023
75
88
29 Sep 2023
75
88
2 Dec 2022
54
80
Total Floor Area
106 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
82 ABBOTSHAVEN , BALINTORE
Date
30 Nov 2022
Current
Potential
57
80
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
30 Nov 2022
57
80
9 Mar 2022
63
79
Total Floor Area
107 sq m
Current CO2 Emissions Level
9.2
Potential CO2 Emissions Level
3.6
CO2 per sq m per Year
87
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
84 ABBOTSHAVEN , BALINTORE
Date
27 Aug 2023
Current
Potential
77
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
27 Aug 2023
77
89
26 Aug 2023
77
89
1 Dec 2022
47
80
Total Floor Area
96 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
88 ABBOTSHAVEN , BALINTORE
Date
29 Nov 2022
Current
Potential
67
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
29 Nov 2022
67
81
Total Floor Area
107 sq m
Current CO2 Emissions Level
7.3
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
68
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
90 ABBOTSHAVEN , BALINTORE
Date
27 Aug 2023
Current
Potential
79
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
27 Aug 2023
79
89
26 Aug 2023
79
89
24 Mar 2021
56
80
2 Dec 2022
60
81
Total Floor Area
107 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
92 ABBOTSHAVEN , BALINTORE
Date
30 Nov 2022
Current
Potential
49
73
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
30 Nov 2022
49
73
24 Apr 2018
32
53
Total Floor Area
106 sq m
Current CO2 Emissions Level
5.7
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
54
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
94 ABBOTSHAVEN , BALINTORE
Date
11 Nov 2022
Current
Potential
71
88
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1964
+
Certificate History
11 Nov 2022
71
88
20 Jul 2020
55
83
Total Floor Area
90 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
32
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
98B ABBOTSHAVEN , BALINTORE
Date
7 Mar 2023
Current
Potential
62
74
Property Type
Flat
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
7 Mar 2023
62
74
Total Floor Area
40 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
108
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.