PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Cromarty Drive, INVERGORDON, IV18 0PY

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Cromarty Drive, IV18 0PY are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Cromarty Drive, INVERGORDON, IV18 0PY
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 CROMARTY DRIVE , MILTON
Date
29 Sep 2016
Current
Potential
65
85
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
29 Sep 2016
65
85
28 Sep 2016
65
85
27 Sep 2016
65
85
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
41
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
10 CROMARTY DRIVE , MILTON
Date
1 Feb 2013
Current
Potential
43
66
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
1 Feb 2013
43
66
Total Floor Area
120 sq m
Current CO2 Emissions Level
13.0
Potential CO2 Emissions Level
3.5
CO2 per sq m per Year
111
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Address
11 CROMARTY DRIVE , MILTON
Date
1 Feb 2013
Current
Potential
43
66
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
1 Feb 2013
43
66
Total Floor Area
120 sq m
Current CO2 Emissions Level
13.0
Potential CO2 Emissions Level
3.6
CO2 per sq m per Year
111
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Address
12 CROMARTY DRIVE , MILTON
Date
3 Feb 2013
Current
Potential
42
66
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
3 Feb 2013
42
66
Total Floor Area
119 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
105
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
13 CROMARTY DRIVE , MILTON
Date
15 Feb 2024
Current
Potential
67
82
Property Type
House
Built Form
End-Terrace
Constructed
1976-1983
+
Certificate History
15 Feb 2024
67
82
9 Dec 2023
55
78
2 Mar 2023
71
88
25 Apr 2013
63
85
Total Floor Area
105 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
0
Address
14 CROMARTY DRIVE , MILTON
Date
31 Jan 2013
Current
Potential
31
56
Property Type
N/A
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
31 Jan 2013
31
56
Total Floor Area
107 sq m
Current CO2 Emissions Level
14.0
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
135
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
15 CROMARTY DRIVE , MILTON
Date
31 Jan 2013
Current
Potential
48
73
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
31 Jan 2013
48
73
Total Floor Area
90 sq m
Current CO2 Emissions Level
8.8
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
98
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
16 CROMARTY DRIVE , MILTON
Date
31 Jan 2013
Current
Potential
54
77
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
31 Jan 2013
54
77
Total Floor Area
90 sq m
Current CO2 Emissions Level
8.6
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
96
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
17 CROMARTY DRIVE , MILTON
Date
9 Dec 2016
Current
Potential
70
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1965-1975
+
Certificate History
9 Dec 2016
70
89
Total Floor Area
100 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
33
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
18 CROMARTY DRIVE , MILTON
Date
31 Jan 2013
Current
Potential
48
68
Property Type
N/A
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
31 Jan 2013
48
68
Total Floor Area
90 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
72
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
19 CROMARTY DRIVE , MILTON
Date
11 Jul 2022
Current
Potential
60
80
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
11 Jul 2022
60
80
10 Jul 2022
60
80
9 Jul 2022
60
80
Total Floor Area
94 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
45
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
2 CROMARTY DRIVE , MILTON
Date
15 Apr 2013
Current
Potential
65
84
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
15 Apr 2013
65
84
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
39
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
20 CROMARTY DRIVE , MILTON
Date
1 Feb 2013
Current
Potential
51
77
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
1 Feb 2013
51
77
Total Floor Area
99 sq m
Current CO2 Emissions Level
8.7
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
88
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
21 CROMARTY DRIVE , MILTON
Date
14 Apr 2013
Current
Potential
71
86
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
14 Apr 2013
71
86
Total Floor Area
103 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
30
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
22 CROMARTY DRIVE , MILTON
Date
28 Jun 2022
Current
Potential
60
80
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
28 Jun 2022
60
80
27 Jun 2022
60
80
26 Jun 2022
60
80
Total Floor Area
94 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
45
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
23 CROMARTY DRIVE , MILTON
Date
24 Oct 2022
Current
Potential
60
88
Property Type
Bungalow
Built Form
Semi-Detached
Constructed
1965-1975
+
Certificate History
24 Oct 2022
60
88
25 Oct 2022
60
88
23 Oct 2022
60
88
1 Feb 2013
61
87
Total Floor Area
52 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
56
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
24 CROMARTY DRIVE , MILTON
Date
25 Nov 2022
Current
Potential
63
86
Property Type
Bungalow
Built Form
Semi-Detached
Constructed
1965-1975
+
Certificate History
25 Nov 2022
63
86
5 Feb 2013
59
86
Total Floor Area
58 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
59
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
1
Address
25 CROMARTY DRIVE , MILTON
Date
25 Mar 2014
Current
Potential
36
58
Property Type
House
Built Form
End-Terrace
Constructed
1992-1998
+
Certificate History
25 Mar 2014
36
58
Total Floor Area
102 sq m
Current CO2 Emissions Level
7.2
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
70
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
26 CROMARTY DRIVE , MILTON
Date
12 May 2016
Current
Potential
71
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1983
+
Certificate History
12 May 2016
71
88
11 May 2016
71
88
10 May 2016
71
88
Total Floor Area
97 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
32
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
27 CROMARTY DRIVE , MILTON
Date
1 Feb 2013
Current
Potential
38
65
Property Type
N/A
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
1 Feb 2013
38
65
Total Floor Area
96 sq m
Current CO2 Emissions Level
11.0
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
118
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
3 CROMARTY DRIVE , MILTON
Date
16 Apr 2013
Current
Potential
66
82
Property Type
N/A
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
16 Apr 2013
66
82
2 May 2024
68
86
17 Apr 2013
66
82
Total Floor Area
103 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
36
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
4 CROMARTY DRIVE , MILTON
Date
24 Apr 2013
Current
Potential
63
82
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
24 Apr 2013
63
82
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
42
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
5 CROMARTY DRIVE , MILTON
Date
14 Apr 2013
Current
Potential
69
85
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
14 Apr 2013
69
85
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
35
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
6 CROMARTY DRIVE , MILTON
Date
15 Apr 2013
Current
Potential
64
82
Property Type
N/A
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
15 Apr 2013
64
82
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
41
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
7 CROMARTY DRIVE , MILTON
Date
11 Jul 2022
Current
Potential
60
80
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
11 Jul 2022
60
80
10 Jul 2022
60
80
9 Jul 2022
60
80
Total Floor Area
94 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
45
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
8 CROMARTY DRIVE , MILTON
Date
1 Feb 2013
Current
Potential
41
68
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
1 Feb 2013
41
68
Total Floor Area
99 sq m
Current CO2 Emissions Level
11.0
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
109
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
9 CROMARTY DRIVE , MILTON
Date
29 Jun 2022
Current
Potential
59
78
Property Type
House
Built Form
End-Terrace
Constructed
1965-1975
+
Certificate History
29 Jun 2022
59
78
28 Jun 2022
59
78
27 Jun 2022
59
78
Total Floor Area
97 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
46
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.