PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Orchard Road, HIGH WYCOMBE, HP13 7DQ

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Orchard Road, HP13 7DQ are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Orchard Road, HIGH WYCOMBE, HP13 7DQ
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Orchard Road
Date
11 Oct 2022
Current
Potential
40
71
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
11 Oct 2022
40
71
Total Floor Area
85 sq m
Current CO2 Emissions Level
6.8
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
80
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
13 Orchard Road
Date
26 Feb 2014
Current
Potential
59
83
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
26 Feb 2014
59
83
Total Floor Area
85 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
15 ORCHARD ROAD, HIGH WYCOMBE
Date
30 Nov 2020
Current
Potential
39
67
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
30 Nov 2020
39
67
Total Floor Area
84 sq m
Current CO2 Emissions Level
7.0
Potential CO2 Emissions Level
3.8
CO2 per sq m per Year
83
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
17 Orchard Road
Date
26 Feb 2014
Current
Potential
62
85
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
26 Feb 2014
62
85
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
19 Orchard Road
Date
11 Apr 2022
Current
Potential
74
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
11 Apr 2022
74
88
26 Feb 2014
69
83
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
21 Orchard Road
Date
11 Apr 2022
Current
Potential
72
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
11 Apr 2022
72
88
26 Feb 2014
70
85
3 May 2010
62
64
16 Oct 2008
64
76
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
23 Orchard Road
Date
11 Apr 2022
Current
Potential
72
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
11 Apr 2022
72
88
26 Feb 2014
68
82
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
27 Orchard Road
Date
26 Feb 2014
Current
Potential
72
86
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
26 Feb 2014
72
86
Total Floor Area
85 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
29 Orchard Road
Date
18 Apr 2022
Current
Potential
72
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
18 Apr 2022
72
88
26 Feb 2014
66
81
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
3 Orchard Road
Date
18 Oct 2017
Current
Potential
51
87
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
18 Oct 2017
51
87
Total Floor Area
83 sq m
Current CO2 Emissions Level
5.4
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
31 Orchard Road
Date
11 Apr 2022
Current
Potential
72
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
11 Apr 2022
72
88
26 Feb 2014
72
86
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
35 Orchard Road
Date
11 Aug 2015
Current
Potential
63
87
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
11 Aug 2015
63
87
Total Floor Area
99 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
37 Orchard Road
Date
29 May 2017
Current
Potential
48
84
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
29 May 2017
48
84
Total Floor Area
83 sq m
Current CO2 Emissions Level
5.7
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
69
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
39 Orchard Road
Date
1 Dec 2011
Current
Potential
51
70
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
1 Dec 2011
51
70
Total Floor Area
83 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
5 Orchard Road
Date
11 Apr 2022
Current
Potential
72
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
11 Apr 2022
72
88
26 Feb 2014
62
84
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
7 Orchard Road
Date
19 May 2013
Current
Potential
71
87
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
19 May 2013
71
87
19 May 2013
61
86
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
9 Orchard Road
Date
26 Feb 2014
Current
Potential
70
86
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
26 Feb 2014
70
86
Total Floor Area
84 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.