PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Upper Terrace, Greenway Road, MORETON-IN-MARSH, GL56 9BH

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Upper Terrace, Greenway Road, GL56 9BH are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Upper Terrace, Greenway Road, MORETON-IN-MARSH, GL56 9BH
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
2 Upper Terrace, Greenway Road
Date
23 May 2019
Current
Potential
63
87
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
23 May 2019
63
87
6 Jan 2009
58
66
Total Floor Area
70 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
3 Upper Terrace, Greenway Road
Date
13 Feb 2012
Current
Potential
58
66
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
13 Feb 2012
58
66
Total Floor Area
55 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
4 Upper Terrace, Greenway Road
Date
21 Jul 2010
Current
Potential
54
56
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
21 Jul 2010
54
56
Total Floor Area
43 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
3.5
CO2 per sq m per Year
61
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
6 Upper Terrace, Greenway Road
Date
8 Apr 2010
Current
Potential
43
53
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
8 Apr 2010
43
53
Total Floor Area
60 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
3.9
CO2 per sq m per Year
80
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
7 Upper Terrace, Greenway Road
Date
10 Mar 2022
Current
Potential
58
88
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
10 Mar 2022
58
88
Total Floor Area
108 sq m
Current CO2 Emissions Level
5.7
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
9 Upper Terrace, Greenway Lane
Date
25 Mar 2013
Current
Potential
59
81
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
25 Mar 2013
59
81
Total Floor Area
72 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
Crows Nest, Upper Terrace
Date
12 May 2009
Current
Potential
28
38
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
12 May 2009
28
38
Total Floor Area
74 sq m
Current CO2 Emissions Level
8.4
Potential CO2 Emissions Level
6.9
CO2 per sq m per Year
114
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.