PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Raleigh Park, SOUTH MOLTON, EX36 4DR

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Raleigh Park, EX36 4DR are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Raleigh Park, SOUTH MOLTON, EX36 4DR
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
24 Raleigh Park
Date
30 Nov 2018
Current
Potential
71
79
Property Type
House
Built Form
Semi-Detached
Constructed
1983-1990
+
Certificate History
30 Nov 2018
71
79
10 Mar 2015
68
84
4 Jul 2010
69
77
Total Floor Area
177 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
10
Number of Extensions
2
Address
28 Raleigh Park
Date
29 Jun 2010
Current
Potential
62
76
Property Type
House
Built Form
Semi-Detached
Constructed
1976-1982
+
Certificate History
29 Jun 2010
62
76
Total Floor Area
182 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
4.6
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
9
Number of Extensions
1
Address
29 Raleigh Park
Date
26 Jun 2023
Current
Potential
63
74
Property Type
Bungalow
Built Form
Detached
Constructed
1930-1949
+
Certificate History
26 Jun 2023
63
74
26 Mar 2014
64
73
Total Floor Area
131 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
25
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
30 Raleigh Park
Date
9 Apr 2019
Current
Potential
68
80
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
9 Apr 2019
68
80
Total Floor Area
110 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
31 Raleigh Park
Date
20 May 2015
Current
Potential
58
87
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
20 May 2015
58
87
Total Floor Area
77 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
56
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.