PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Neville Parade, NEWTON AYCLIFFE, DL5 5DH

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Neville Parade, DL5 5DH are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Neville Parade, NEWTON AYCLIFFE, DL5 5DH
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
12 Neville Parade
Date
11 Nov 2022
Current
Potential
70
73
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
11 Nov 2022
70
73
31 Mar 2009
66
67
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
13 Neville Parade
Date
31 Mar 2009
Current
Potential
71
71
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
31 Mar 2009
71
71
Total Floor Area
54 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
13 NEVILLE PARADE, NEWTON AYCLIFFE
Date
17 Nov 2020
Current
Potential
72
74
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
17 Nov 2020
72
74
Total Floor Area
58 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
14 Neville Parade
Date
24 Oct 2019
Current
Potential
69
72
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
24 Oct 2019
69
72
29 Jan 2015
66
69
31 Mar 2009
65
66
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
15 Neville Parade
Date
31 Mar 2009
Current
Potential
65
66
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
31 Mar 2009
65
66
Total Floor Area
82 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
15 NEVILLE PARADE, NEWTON AYCLIFFE
Date
25 Jan 2021
Current
Potential
72
75
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
25 Jan 2021
72
75
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
16 Neville Parade
Date
13 Mar 2017
Current
Potential
66
74
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
13 Mar 2017
66
74
31 Mar 2009
65
66
Total Floor Area
49 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
17 Neville Parade
Date
2 Jul 2019
Current
Potential
68
74
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
2 Jul 2019
68
74
17 Dec 2014
66
75
4 Dec 2013
68
77
31 Mar 2009
65
66
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
18 Neville Parade
Date
9 Mar 2015
Current
Potential
65
75
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
9 Mar 2015
65
75
31 Mar 2009
65
66
Total Floor Area
83 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
19 Neville Parade
Date
2 Jul 2019
Current
Potential
67
68
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
2 Jul 2019
67
68
29 Jul 2018
71
71
31 Mar 2009
65
66
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
20 Neville Parade
Date
22 Feb 2019
Current
Potential
67
67
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
22 Feb 2019
67
67
31 Mar 2009
65
66
Total Floor Area
79 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
21 Neville Parade
Date
31 Mar 2009
Current
Potential
65
66
Property Type
Flat
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
31 Mar 2009
65
66
Total Floor Area
82 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
22 Neville Parade
Date
10 Aug 2014
Current
Potential
65
70
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
10 Aug 2014
65
70
31 Mar 2009
65
66
Total Floor Area
103 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.