PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Pitalpin Street, DUNDEE, DD2 2TT

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Pitalpin Street, DD2 2TT are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Pitalpin Street, DUNDEE, DD2 2TT
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1ST FLOOR PITALPIN HOUSE , PITALPIN STREET
Date
22 Apr 2013
Current
Potential
44
60
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
22 Apr 2013
44
60
Total Floor Area
108 sq m
Current CO2 Emissions Level
9.0
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
83
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
41 PITALPIN STREET
Date
7 Oct 2013
Current
Potential
51
87
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
7 Oct 2013
51
87
8 Oct 2013
51
87
6 Oct 2013
51
87
Total Floor Area
129 sq m
Current CO2 Emissions Level
8.0
Potential CO2 Emissions Level
5.9
CO2 per sq m per Year
62
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
43 PITALPIN STREET
Date
11 Oct 2018
Current
Potential
65
78
Property Type
Flat
Built Form
Mid-Terrace
Constructed
before 1919
+
Certificate History
11 Oct 2018
65
78
10 Oct 2018
65
78
9 Oct 2018
65
78
Total Floor Area
45 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
58
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
45 PITALPIN STREET
Date
20 Jun 2016
Current
Potential
59
77
Property Type
Flat
Built Form
End-Terrace
Constructed
before 1919
+
Certificate History
20 Jun 2016
59
77
19 Jun 2016
59
77
18 Jun 2016
59
77
Total Floor Area
81 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
64
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Flat A Pitalpin Mill , Donalds Lane
Date
3 Jul 2018
Current
Potential
78
78
Property Type
Flat
Built Form
End-Terrace
Constructed
before 1919
+
Certificate History
3 Jul 2018
78
78
4 Jul 2018
78
78
2 Jul 2018
78
78
Total Floor Area
64 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
29
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Flat B Pitalpin Mill , Donalds Lane
Date
3 Jul 2018
Current
Potential
79
79
Property Type
Flat
Built Form
End-Terrace
Constructed
before 1919
+
Certificate History
3 Jul 2018
79
79
4 Jul 2018
79
79
2 Jul 2018
79
79
Total Floor Area
85 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Flat C Pitalpin Mill , Donalds Lane
Date
3 Jul 2018
Current
Potential
83
83
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
before 1919
+
Certificate History
3 Jul 2018
83
83
4 Jul 2018
83
83
2 Jul 2018
83
83
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.5
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
19
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Flat D Pitalpin Mill , Donalds Lane
Date
3 Jul 2018
Current
Potential
83
83
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
before 1919
+
Certificate History
3 Jul 2018
83
83
4 Jul 2018
83
83
2 Jul 2018
83
83
Total Floor Area
85 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
19
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
Flat E Pitalpin Mill , Donalds Lane
Date
3 Jul 2018
Current
Potential
77
77
Property Type
Flat
Built Form
Semi-Detached
Constructed
before 1919
+
Certificate History
3 Jul 2018
77
77
4 Jul 2018
77
77
2 Jul 2018
77
77
Total Floor Area
96 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
29
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
PITALPIN HOUSE , PITALPIN STREET
Date
2 Dec 2014
Current
Potential
42
68
Property Type
House
Built Form
End-Terrace
Constructed
before 1919
+
Certificate History
2 Dec 2014
42
68
Total Floor Area
314 sq m
Current CO2 Emissions Level
21.0
Potential CO2 Emissions Level
9.0
CO2 per sq m per Year
67
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
3
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.