PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Essich Street, CARDIFF, CF24 3LT

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Essich Street, CF24 3LT are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Essich Street, CARDIFF, CF24 3LT
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 ESSICH STREET
Date
30 Jun 2021
Current
Potential
58
81
Property Type
House
Built Form
End-Terrace
Constructed
before 1900
+
Certificate History
30 Jun 2021
58
81
Total Floor Area
106 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
2
Address
10 Essich Street
Date
2 Nov 2024
Current
Potential
64
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
2 Nov 2024
64
79
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
11 Essich Street
Date
16 Feb 2010
Current
Potential
58
59
Property Type
House
Built Form
End-Terrace
Constructed
before 1900
+
Certificate History
16 Feb 2010
58
59
Total Floor Area
123 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
5.2
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
12 Essich Street
Date
30 Mar 2022
Current
Potential
29
75
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
30 Mar 2022
29
75
Total Floor Area
60 sq m
Current CO2 Emissions Level
7.8
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
130
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Address
14 Essich Street
Date
22 Jan 2020
Current
Potential
56
84
Property Type
House
Built Form
End-Terrace
Constructed
before 1900
+
Certificate History
22 Jan 2020
56
84
24 Feb 2010
59
64
Total Floor Area
93 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
3 Essich Street
Date
4 Feb 2019
Current
Potential
65
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
4 Feb 2019
65
86
17 Feb 2009
54
77
Total Floor Area
104 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
4 Essich Street
Date
26 May 2010
Current
Potential
42
54
Property Type
House
Built Form
Mid-Terrace
Constructed
before 1900
+
Certificate History
26 May 2010
42
54
Total Floor Area
64 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
4.7
CO2 per sq m per Year
96
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
5 Essich Street
Date
13 Aug 2015
Current
Potential
52
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
13 Aug 2015
52
81
Total Floor Area
112 sq m
Current CO2 Emissions Level
6.0
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
6 Essich Street
Date
30 Nov 2021
Current
Potential
67
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
30 Nov 2021
67
88
Total Floor Area
67 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
7 Essich Street
Date
24 Apr 2020
Current
Potential
66
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
24 Apr 2020
66
82
Total Floor Area
105 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
8 Essich Street
Date
30 Nov 2021
Current
Potential
68
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
30 Nov 2021
68
88
15 Feb 2011
58
69
Total Floor Area
67 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
9 Essich Street
Date
25 Aug 2014
Current
Potential
62
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
25 Aug 2014
62
79
Total Floor Area
106 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.