PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Waitby, KIRKBY STEPHEN, CA17 4HF

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for CA17 4HF are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Waitby, KIRKBY STEPHEN, CA17 4HF
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
Low Garth, Waitby
Date
10 Sep 2019
Current
Potential
49
85
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
10 Sep 2019
49
85
20 Jan 2009
49
57
Total Floor Area
227 sq m
Current CO2 Emissions Level
15.0
Potential CO2 Emissions Level
6.2
CO2 per sq m per Year
65
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
1
Address
Mill Bank House, Waitby
Date
12 Jul 2009
Current
Potential
65
65
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
12 Jul 2009
65
65
Total Floor Area
97 sq m
Current CO2 Emissions Level
5.0
Potential CO2 Emissions Level
5.0
CO2 per sq m per Year
52
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
Prospect Cottage, Waitby
Date
7 Nov 2018
Current
Potential
27
97
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
7 Nov 2018
27
97
15 Apr 2015
32
101
Total Floor Area
99 sq m
Current CO2 Emissions Level
15.0
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
150
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
2
Address
Waitby Longbarn, Waitby
Date
5 May 2016
Current
Potential
67
86
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
5 May 2016
67
86
Total Floor Area
205 sq m
Current CO2 Emissions Level
9.1
Potential CO2 Emissions Level
5.3
CO2 per sq m per Year
44
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
4
Address
Wharton House, Waitby
Date
23 Nov 2022
Current
Potential
29
88
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
23 Nov 2022
29
88
Total Floor Area
158 sq m
Current CO2 Emissions Level
16.0
Potential CO2 Emissions Level
4.0
CO2 per sq m per Year
99
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.