PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Glevum Close, BRISTOL, BS16 7HJ

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Glevum Close, BS16 7HJ are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Glevum Close, BRISTOL, BS16 7HJ
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Glevum Close, Emersons Green
Date
21 Nov 2023
Current
Potential
65
82
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
21 Nov 2023
65
82
6 Feb 2020
68
82
Total Floor Area
119 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
10 Glevum Close, Emersons Green
Date
20 Jul 2021
Current
Potential
61
80
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
20 Jul 2021
61
80
Total Floor Area
121 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
11 Glevum Close, Emersons Green
Date
6 Mar 2019
Current
Potential
71
82
Property Type
House
Built Form
Detached
Constructed
2003-2006
+
Certificate History
6 Mar 2019
71
82
Total Floor Area
115 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
12 Glevum Close, Emersons Green
Date
23 Jun 2019
Current
Potential
62
78
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
23 Jun 2019
62
78
Total Floor Area
115 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
14 Glevum Close, Emersons Green
Date
20 Jul 2021
Current
Potential
60
81
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
20 Jul 2021
60
81
Total Floor Area
115 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
15 Glevum Close, Emersons Green
Date
22 Jul 2021
Current
Potential
64
82
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
22 Jul 2021
64
82
Total Floor Area
120 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
16 Glevum Close, Emersons Green
Date
6 Feb 2020
Current
Potential
68
81
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
6 Feb 2020
68
81
Total Floor Area
119 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
17 Glevum Close, Emersons Green
Date
21 Nov 2023
Current
Potential
65
81
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
21 Nov 2023
65
81
12 Jan 2020
67
80
Total Floor Area
129 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
18 Glevum Close, Emersons Green
Date
21 Nov 2023
Current
Potential
65
80
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
21 Nov 2023
65
80
6 Feb 2020
69
80
Total Floor Area
135 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
19 Glevum Close, Emersons Green
Date
30 Jun 2022
Current
Potential
69
80
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
30 Jun 2022
69
80
Total Floor Area
143 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
2 Glevum Close, Emersons Green
Date
20 Jul 2021
Current
Potential
61
80
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
20 Jul 2021
61
80
Total Floor Area
115 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
3 Glevum Close, Emersons Green
Date
21 Nov 2023
Current
Potential
66
81
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
21 Nov 2023
66
81
23 Jun 2019
69
81
Total Floor Area
119 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
4 Glevum Close, Emersons Green
Date
23 Jun 2019
Current
Potential
68
81
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
23 Jun 2019
68
81
Total Floor Area
118 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
5 Glevum Close, Emersons Green
Date
23 Jun 2019
Current
Potential
67
80
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
23 Jun 2019
67
80
Total Floor Area
130 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
8 Glevum Close, Emersons Green
Date
17 Jul 2022
Current
Potential
62
81
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
17 Jul 2022
62
81
Total Floor Area
120 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
0
Address
9 Glevum Close, Emersons Green
Date
20 Jul 2021
Current
Potential
65
80
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
20 Jul 2021
65
80
Total Floor Area
121 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.