PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
King Edward Avenue, WORTHING, BN14 8DW

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for King Edward Avenue, BN14 8DW are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for King Edward Avenue, WORTHING, BN14 8DW
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
149 King Edward Avenue
Date
11 Jun 2017
Current
Potential
62
82
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
11 Jun 2017
62
82
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
157 King Edward Avenue
Date
3 Oct 2012
Current
Potential
71
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
3 Oct 2012
71
85
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
165 King Edward Avenue
Date
2 Jul 2015
Current
Potential
72
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
2 Jul 2015
72
84
Total Floor Area
103 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
167 King Edward Avenue
Date
29 Mar 2019
Current
Potential
67
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
29 Mar 2019
67
79
17 Oct 2010
22
25
Total Floor Area
99 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
171 King Edward Avenue
Date
9 May 2019
Current
Potential
51
83
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
9 May 2019
51
83
Total Floor Area
86 sq m
Current CO2 Emissions Level
5.0
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
58
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
173 King Edward Avenue
Date
23 Jun 2015
Current
Potential
67
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
23 Jun 2015
67
86
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
175 King Edward Avenue
Date
8 Feb 2018
Current
Potential
71
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
8 Feb 2018
71
88
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
177 King Edward Avenue
Date
9 Jan 2017
Current
Potential
64
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
9 Jan 2017
64
82
Total Floor Area
90 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
183 King Edward Avenue
Date
21 Aug 2014
Current
Potential
64
83
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
21 Aug 2014
64
83
29 Oct 2009
58
75
Total Floor Area
97 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
185 King Edward Avenue
Date
16 Apr 2023
Current
Potential
71
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
16 Apr 2023
71
85
20 Nov 2008
73
78
Total Floor Area
88 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
193 King Edward Avenue
Date
4 Aug 2014
Current
Potential
52
84
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
4 Aug 2014
52
84
16 Oct 2013
67
88
Total Floor Area
107 sq m
Current CO2 Emissions Level
5.8
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
195 King Edward Avenue
Date
11 Sep 2014
Current
Potential
61
87
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
11 Sep 2014
61
87
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
197 King Edward Avenue
Date
9 May 2013
Current
Potential
60
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
9 May 2013
60
90
Total Floor Area
89 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
201 King Edward Avenue
Date
18 Mar 2020
Current
Potential
70
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
18 Mar 2020
70
83
30 Jun 2009
56
79
Total Floor Area
119 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
205 King Edward Avenue
Date
14 Nov 2018
Current
Potential
68
82
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
14 Nov 2018
68
82
Total Floor Area
93 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.