PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Hillside, WELLS, BA5 3QE

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Hillside, BA5 3QE are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Hillside, WELLS, BA5 3QE
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 Hillside, South Horrington Village
Date
19 Mar 2009
Current
Potential
74
77
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
19 Mar 2009
74
77
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
11 Hillside, South Horrington Village
Date
3 Oct 2019
Current
Potential
70
84
Property Type
House
Built Form
Semi-Detached
Constructed
1996-2002
+
Certificate History
3 Oct 2019
70
84
20 Sep 2009
71
78
Total Floor Area
87 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
12 Hillside, South Horrington Village
Date
11 Dec 2019
Current
Potential
67
86
Property Type
House
Built Form
Semi-Detached
Constructed
1996-2002
+
Certificate History
11 Dec 2019
67
86
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
2 Hillside, South Horrington Village
Date
8 Nov 2012
Current
Potential
71
88
Property Type
House
Built Form
Semi-Detached
Constructed
1996-2002
+
Certificate History
8 Nov 2012
71
88
Total Floor Area
76 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
3 Hillside, South Horrington Village
Date
16 Sep 2024
Current
Potential
69
85
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
16 Sep 2024
69
85
Total Floor Area
98 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
4 Hillside, South Horrington Village
Date
25 Feb 2010
Current
Potential
76
79
Property Type
House
Built Form
Semi-Detached
Constructed
1996-2002
+
Certificate History
25 Feb 2010
76
79
Total Floor Area
83 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
5 Hillside, South Horrington Village
Date
7 Nov 2025
Current
Potential
74
79
Property Type
House
Built Form
Semi-Detached
Constructed
1996-2002
+
Certificate History
7 Nov 2025
74
79
27 Oct 2015
68
86
Total Floor Area
62 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
6 Hillside, South Horrington Village
Date
4 Jun 2019
Current
Potential
74
88
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
4 Jun 2019
74
88
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
7 Hillside, South Horrington Village
Date
24 Feb 2022
Current
Potential
73
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
24 Feb 2022
73
90
Total Floor Area
59 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
0.5
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
8 Hillside, South Horrington Village
Date
7 Sep 2020
Current
Potential
73
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
7 Sep 2020
73
90
14 Sep 2009
77
81
Total Floor Area
69 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
9 Hillside, South Horrington Village
Date
8 Jun 2023
Current
Potential
74
91
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
8 Jun 2023
74
91
1 Jun 2009
78
81
Total Floor Area
59 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2026.