PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Holloway, BATH, BA2 4PT

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Holloway, BA2 4PT are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Holloway, BATH, BA2 4PT
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 Holloway
Date
9 Jun 2010
Current
Potential
56
76
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
9 Jun 2010
56
76
13 Aug 2009
67
78
Total Floor Area
68 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
64
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
2 Holloway
Date
5 Jan 2022
Current
Potential
66
87
Property Type
House
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
5 Jan 2022
66
87
20 Dec 2011
65
71
Total Floor Area
68 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
27 Holloway
Date
25 Oct 2018
Current
Potential
66
82
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
25 Oct 2018
66
82
21 Oct 2008
66
67
Total Floor Area
118 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
31 Holloway
Date
26 Apr 2016
Current
Potential
45
80
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
26 Apr 2016
45
80
Total Floor Area
111 sq m
Current CO2 Emissions Level
7.1
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
64
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
33 Holloway
Date
9 Jun 2014
Current
Potential
64
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
9 Jun 2014
64
81
Total Floor Area
105 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
35 Holloway
Date
8 Jun 2022
Current
Potential
73
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
8 Jun 2022
73
85
26 Apr 2012
64
81
Total Floor Area
116 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
37 Holloway
Date
25 Aug 2014
Current
Potential
68
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
25 Aug 2014
68
84
Total Floor Area
127 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
39 Holloway
Date
25 Oct 2018
Current
Potential
63
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
25 Oct 2018
63
84
16 Oct 2008
68
79
Total Floor Area
117 sq m
Current CO2 Emissions Level
5.0
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
4 HOLLOWAY, WIDCOMBE
Date
8 Mar 2021
Current
Potential
71
91
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
8 Mar 2021
71
91
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
41 Holloway
Date
14 Jul 2020
Current
Potential
68
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
14 Jul 2020
68
83
15 Feb 2010
63
74
Total Floor Area
113 sq m
Current CO2 Emissions Level
4.2
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
43 Holloway
Date
14 Nov 2023
Current
Potential
71
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
14 Nov 2023
71
81
23 Jan 2013
70
86
Total Floor Area
108 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
45 Holloway
Date
23 Jul 2019
Current
Potential
69
84
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
23 Jul 2019
69
84
3 Dec 2008
68
78
Total Floor Area
111 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
47 Holloway
Date
6 Feb 2019
Current
Potential
67
82
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
6 Feb 2019
67
82
18 Feb 2009
62
78
Total Floor Area
124 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
6 Holloway
Date
18 Dec 2018
Current
Potential
73
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
18 Dec 2018
73
88
16 Dec 2008
57
75
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
76 Holloway
Date
11 May 2010
Current
Potential
65
71
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
11 May 2010
65
71
Total Floor Area
76 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
3.7
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
76 HOLLOWAY, WIDCOMBE
Date
18 Nov 2020
Current
Potential
66
87
Property Type
House
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
18 Nov 2020
66
87
Total Floor Area
68 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
78 Holloway
Date
15 Feb 2019
Current
Potential
71
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
15 Feb 2019
71
88
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
8 Holloway
Date
29 Feb 2016
Current
Potential
73
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
29 Feb 2016
73
89
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
80 Holloway
Date
10 May 2016
Current
Potential
74
87
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
10 May 2016
74
87
Total Floor Area
68 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.