PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Anderton Park Road, BIRMINGHAM, B13 9BQ

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Anderton Park Road, B13 9BQ are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Anderton Park Road, BIRMINGHAM, B13 9BQ
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Anderton Park Road
Date
1 Mar 2016
Current
Potential
44
71
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
1 Mar 2016
44
71
13 Jul 2014
42
67
Total Floor Area
245 sq m
Current CO2 Emissions Level
16.0
Potential CO2 Emissions Level
8.1
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
9
Number of Extensions
1
Address
13 Anderton Park Road
Date
28 Dec 2013
Current
Potential
39
69
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
28 Dec 2013
39
69
7 Nov 2013
23
63
30 Sep 2013
29
65
Total Floor Area
163 sq m
Current CO2 Emissions Level
11.0
Potential CO2 Emissions Level
5.6
CO2 per sq m per Year
69
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
15 Anderton Park Road
Date
17 Jul 2014
Current
Potential
70
88
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
17 Jul 2014
70
88
5 Aug 2011
37
45
Total Floor Area
144 sq m
Current CO2 Emissions Level
5.6
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
2
Address
17 Anderton Park Road
Date
27 Apr 2013
Current
Potential
42
70
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
27 Apr 2013
42
70
Total Floor Area
138 sq m
Current CO2 Emissions Level
9.2
Potential CO2 Emissions Level
4.7
CO2 per sq m per Year
67
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
19 Anderton Park Road
Date
23 Mar 2012
Current
Potential
1
1
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
23 Mar 2012
1
1
Total Floor Area
117 sq m
Current CO2 Emissions Level
15.0
Potential CO2 Emissions Level
15.0
CO2 per sq m per Year
129
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
21 Anderton Park Road
Date
6 Apr 2016
Current
Potential
50
68
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
6 Apr 2016
50
68
2 Nov 2015
33
69
Total Floor Area
201 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
7.8
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
25 Anderton Park Road
Date
10 Apr 2022
Current
Potential
60
80
Property Type
House
Built Form
End-Terrace
Constructed
1900-1929
+
Certificate History
10 Apr 2022
60
80
13 Sep 2011
46
57
Total Floor Area
179 sq m
Current CO2 Emissions Level
8.3
Potential CO2 Emissions Level
4.1
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
9
Number of Extensions
2
Address
27 Anderton Park Road
Date
26 Apr 2016
Current
Potential
39
77
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
26 Apr 2016
39
77
Total Floor Area
163 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
4.5
CO2 per sq m per Year
76
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
29 Anderton Park Road
Date
23 Oct 2024
Current
Potential
56
83
Property Type
House
Built Form
Detached
Constructed
1930-1949
+
Certificate History
23 Oct 2024
56
83
2 Oct 2013
34
65
18 Feb 2010
30
43
Total Floor Area
140 sq m
Current CO2 Emissions Level
7.6
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.