PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Antonine Gate, ST. ALBANS, AL3 4JA

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Antonine Gate, AL3 4JA are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Antonine Gate, ST. ALBANS, AL3 4JA
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Antonine Gate
Date
19 Oct 2020
Current
Potential
71
82
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
19 Oct 2020
71
82
Total Floor Area
123 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
10 Antonine Gate
Date
14 Aug 2015
Current
Potential
72
85
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
14 Aug 2015
72
85
Total Floor Area
114 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
11 Antonine Gate
Date
13 Jun 2016
Current
Potential
67
81
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
13 Jun 2016
67
81
Total Floor Area
120 sq m
Current CO2 Emissions Level
4.3
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
16 Antonine Gate
Date
2 Nov 2023
Current
Potential
60
83
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
2 Nov 2023
60
83
Total Floor Area
111 sq m
Current CO2 Emissions Level
5.4
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
17 Antonine Gate
Date
26 Sep 2024
Current
Potential
71
74
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
26 Sep 2024
71
74
Total Floor Area
102 sq m
Current CO2 Emissions Level
0.8
Potential CO2 Emissions Level
0.3
CO2 per sq m per Year
7
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
3 Antonine Gate
Date
28 Oct 2013
Current
Potential
71
85
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
28 Oct 2013
71
85
Total Floor Area
97 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
4 Antonine Gate
Date
19 Nov 2021
Current
Potential
59
81
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
19 Nov 2021
59
81
Total Floor Area
98 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
5 ANTONINE GATE, ST ALBANS
Date
29 Mar 2021
Current
Potential
72
87
Property Type
House
Built Form
Detached
Constructed
1983-1990
+
Certificate History
29 Mar 2021
72
87
Total Floor Area
91 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
6 Antonine Gate
Date
19 Nov 2012
Current
Potential
71
85
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
19 Nov 2012
71
85
Total Floor Area
104 sq m
Current CO2 Emissions Level
3.2
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
7 Antonine Gate
Date
26 Jul 2020
Current
Potential
67
79
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
26 Jul 2020
67
79
Total Floor Area
117 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
2
Address
9 Antonine Gate
Date
4 Oct 2015
Current
Potential
51
83
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
4 Oct 2015
51
83
9 Jan 2009
56
73
Total Floor Area
116 sq m
Current CO2 Emissions Level
7.1
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
61
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.