PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Broomhill Road, ABERDEEN, AB10 6JP

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Broomhill Road, AB10 6JP are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Broomhill Road, ABERDEEN, AB10 6JP
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
184 BROOMHILL ROAD
Date
29 May 2024
Current
Potential
42
82
Property Type
House
Built Form
Detached
Constructed
1930-1949
+
Certificate History
29 May 2024
42
82
18 Jul 2021
41
81
19 Jul 2021
41
81
17 Jul 2021
41
81
Total Floor Area
138 sq m
Current CO2 Emissions Level
11.0
Potential CO2 Emissions Level
7.1
CO2 per sq m per Year
82
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Address
186 BROOMHILL ROAD
Date
9 Nov 2021
Current
Potential
69
81
Property Type
House
Built Form
Detached
Constructed
1999-2002
+
Certificate History
9 Nov 2021
69
81
Total Floor Area
184 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
40
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
1
Address
188 BROOMHILL ROAD
Date
9 Apr 2013
Current
Potential
62
75
Property Type
N/A
Built Form
N/A
Constructed
N/A
+
Certificate History
9 Apr 2013
62
75
Total Floor Area
174 sq m
Current CO2 Emissions Level
8.0
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
1
Address
240 BROOMHILL ROAD
Date
2 Aug 2016
Current
Potential
52
82
Property Type
Bungalow
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
2 Aug 2016
52
82
3 Aug 2016
52
82
1 Aug 2016
52
82
Total Floor Area
188 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
7.0
CO2 per sq m per Year
63
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
244 BROOMHILL ROAD
Date
9 May 2016
Current
Potential
69
80
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
9 May 2016
69
80
10 May 2016
69
80
8 May 2016
69
80
Total Floor Area
145 sq m
Current CO2 Emissions Level
6.0
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
42
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
1
Address
246 BROOMHILL ROAD
Date
14 Jul 2020
Current
Potential
53
87
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
14 Jul 2020
53
87
15 Jul 2020
53
87
13 Jul 2020
53
87
Total Floor Area
107 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
5.3
CO2 per sq m per Year
69
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Address
250 BROOMHILL ROAD
Date
3 Apr 2024
Current
Potential
66
77
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
3 Apr 2024
66
77
Total Floor Area
139 sq m
Current CO2 Emissions Level
6.5
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
47
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
0
Address
252 BROOMHILL ROAD
Date
5 Oct 2017
Current
Potential
68
85
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
5 Oct 2017
68
85
2 May 2024
60
79
6 Oct 2017
68
85
4 Oct 2017
68
85
Total Floor Area
139 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
43
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
254 BROOMHILL ROAD
Date
31 May 2016
Current
Potential
53
84
Property Type
Bungalow
Built Form
Semi-Detached
Constructed
1919-1929
+
Certificate History
31 May 2016
53
84
30 May 2016
53
84
29 May 2016
53
84
Total Floor Area
140 sq m
Current CO2 Emissions Level
9.0
Potential CO2 Emissions Level
5.6
CO2 per sq m per Year
64
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.