ROADWORK EVENT SUMMARY
Rawmarsh Hill, Parkgate, Rotherham between 20 and 27 Dec 2024
Works Description for Rawmarsh Hill, Parkgate, Rotherham
Northern Powergrid (Yorkshire) carried out Utility repair and maintenance works on Rawmarsh Hill, Parkgate, Rotherham.
These works were categorised as Urgent Works with an immediate start.
Two-way signals were in place for some or all of the period.
The works were originally planned between 20 Dec 2024 and 30 Dec 2024 and were actually completed between 20 Dec 2024 (16:15) and 27 Dec 2024 (18:00). The works impacted the footway and carriageway.
The information for these works was last updated by Northern Powergrid (Yorkshire) on 28 December 2024 at 07:36.
Works Map for Rawmarsh Hill, Parkgate, Rotherham
Works Details
Northern Powergrid (Yorkshire)
Rotherham Metropolitan Borough Council
Works Reference | QA202I591168A |
Permit Number | 01 |
Place Name |
Rawmarsh Hill Parkgate Rotherham |
Proposed Start | 20 Dec 2024 |
Proposed End | 30 Dec 2024 |
Actual Start | 20 Dec 2024 16:15 |
Actual End | 27 Dec 2024 18:00 |
Traffic Management | Two-way signals |
Impact | Footway, Carriageway |
Coordinates Lat, Lon |
53.454967 -1.343767 |
Last Updated | 28 Dec 2024 07:36 |
Works Permits for Rawmarsh Hill, Parkgate, Rotherham
For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.
Applies to all permits.
For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.
Applies to all permits.
For the activities hereby permitted, it is a condition of this permit that activities shall only take place between [start time] and [end time] on weekdays and [start time] and [end time] on Saturdays and [start time] and [end time] on Sundays or Bank Holiday.
For the activities hereby permitted, it is a condition of this permit that [x]m must be maintained for pedestrians and/or [y]m must be maintained for vehicles at the specified times.
For the activities hereby permitted, it is a condition of this permit that works, or the relevant part of the activity, shall only take place when the following traffic management is deployed by use of x (where x determines type of control i.e. portable signals, stop/go boards etc.)
For the activities hereby permitted, it is a condition of this permit that, for the traffic management deployed (state type), it is manually operated between (x hours and y hours).
For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.
Applies to all permits.
Proposed Work Dates
Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.
Problems with roadworks?
On rare occasions, issues may occur during or after the completion of roadworks, such as:
- Poor reinstatement of the footpath or the carriageway.
- Rubbish and mess remaining after the works have completed.
- Traffic management issues during the works.
- Equipment left behind after the works have completed.
- Any other issues or disruption that the works may be causing.
In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.
In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.
Unfortunately, here at StreetGuide, we are only publishers of the data provided by the organisations and cannot provide information or assistance on individual works.
Contains public sector information licensed under the Open Government Licence v3.0.