ROADWORK EVENT SUMMARY
A44 From Pembridge To C1081, Pembridge between 27 and 29 Nov 2024

For local roadworks happening in your street and local area, enter your postcode for a detailed report
Type your postcode

Works Description for A44 From Pembridge To C1081, Pembridge

Welsh Water are carrying out Utility asset works on A44 From Pembridge To C1081, Pembridge.

These works are categorised as Emergency Works with an immediate start.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 09:50 and could run through until 29 November 2024. The works will impact the verge only.

The information for these works was last updated by Welsh Water on 27 November 2024 at 10:45.


Share
Follow

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Works Map for A44 From Pembridge To C1081, Pembridge

Works Details

WORKS IN PROGRESS
Immediate - emergency
Welsh Water logo
These works are handled by:
Welsh Water
Local Authority:
Herefordshire Council
Works Reference PE13796693584
Permit Number 01
Place Name A44 From Pembridge To C1081
Pembridge
Proposed Start 27 Nov 2024
Proposed End 29 Nov 2024
Actual Start 27 Nov 2024 09:50
Actual End
Traffic Management Multi-way signals
Impact Verge
Coordinates
Lat, Lon
52.206686
-2.9293
Last Updated 27 Nov 2024 10:45
Works History for Activity PE13796693584 (A44 From Pembridge To C1081, Pembridge)
Proposed
Actual
Date
Activity
Start
End
Start
End
Status
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Nov 2024
09:56
Work Started
27 Nov 2024
09:50
29 Nov 2024
23:59
27 Nov 2024
09:50
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Nov 2024
10:45
Permit Granted
27 Nov 2024
09:50
29 Nov 2024
23:59
27 Nov 2024
09:50
In Progress

Works Permits for A44 From Pembridge To C1081, Pembridge

+
NCT01a (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.

Applies to all permits.

+
NCT01b (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.

Applies to all permits.

+
NCT08a (Traffic management request)

For the activities hereby permitted, it is a condition of this permit that works, or the relevant part of the activity, shall only take place when the following traffic management is deployed by use of x (where x determines type of control i.e. portable signals, stop/go boards etc.)

+
NCT09c (Signal removal from operation when no longer required)

This condition is attached to permits in cases where temporary traffic signals are used. For the activities hereby permitted, it is a condition of this permit that activities using portable traffic signals must have the signals (whether manually operated or not) removed from use as soon as possible and no later than four hours after completion of works irrespective of day of completion.

+
NCT11a (Display of Permit Number)

For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.

Applies to all permits.

Notes

Proposed Work Dates

Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.

Problems with roadworks?

On rare occasions, issues may occur during or after the completion of roadworks, such as:

  • Poor reinstatement of the footpath or the carriageway.
  • Rubbish and mess remaining after the works have completed.
  • Traffic management issues during the works.
  • Equipment left behind after the works have completed.
  • Any other issues or disruption that the works may be causing.

In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.

In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.

Unfortunately, here at StreetGuide, we are only publishers of the data provided by the organisations and cannot provide information or assistance on individual works.

Contains public sector information licensed under the Open Government Licence v3.0.