ROADWORK EVENT SUMMARY
Footpath From Colebrooke Road To Timperley Gardens, Redhill between 15 Oct 2024 and 18 Sep 2026

Works Description for Footpath From Colebrooke Road To Timperley Gardens, Redhill

Surrey County Council are carrying out Highway repair and maintenance works on Footpath From Colebrooke Road To Timperley Gardens, Redhill.

These works are categorised as Emergency Works with an immediate start.

The works should not impact the carriageway.

The works started on 15 October 2024 at 17:24 and could run through until 18 September 2026. The works will impact the footway only.

The information for these works was last updated by Surrey County Council on 7 September 2026 at 10:02.


Share
Follow

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Works Map for Footpath From Colebrooke Road To Timperley Gardens, Redhill

Works Details

WORKS IN PROGRESS
Immediate - emergency
Surrey County Council logo
These works are handled by:
Surrey County Council
Surrey County Council logo
Local Authority:
Surrey County Council
Works Reference MA900592478A
Permit Number 01
Place Name Footpath From Colebrooke Road To Timperley Gardens
Redhill
Proposed Start 15 Oct 2024
Proposed End 18 Sep 2026
Actual Start 15 Oct 2024 17:24
Actual End
Traffic Management No carriageway incursion
Impact Footway
Coordinates
Lat, Lon
51.246411
-0.176536
Last Updated 7 Sep 2026 10:02
Contact Details for Activity MA900592478A (Footpath From Colebrooke Road To Timperley Gardens, Redhill)

In the event that you have an issue with these works, please contact Surrey County Council, the works operator.

It would assist the organisation if you quote the work reference number of MA900592478A.

Works History for Activity MA900592478A (Footpath From Colebrooke Road To Timperley Gardens, Redhill)
Proposed
Actual
Date
Activity
Start
End
Start
End
Status
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Oct 2024
18:24
Work Started
15 Oct 2024
18:24
22 Oct 2024
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Oct 2024
09:33
Permit Granted
15 Oct 2024
18:24
22 Oct 2024
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Oct 2024
15:51
Permit Alteration Granted
15 Oct 2024
18:24
5 Nov 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Nov 2024
14:42
Permit Alteration Granted
15 Oct 2024
18:24
12 Nov 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Nov 2024
10:04
Permit Alteration Granted
15 Oct 2024
18:24
19 Nov 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
18 Nov 2024
15:09
Permit Alteration Granted
15 Oct 2024
18:24
26 Nov 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Nov 2024
08:06
Permit Alteration Granted
15 Oct 2024
18:24
29 Nov 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Nov 2024
15:40
Permit Alteration Granted
15 Oct 2024
18:24
6 Dec 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Dec 2024
13:40
Permit Alteration Granted
15 Oct 2024
18:24
13 Dec 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 Dec 2024
14:30
Permit Alteration Granted
15 Oct 2024
18:24
20 Dec 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Dec 2024
15:00
Permit Alteration Granted
15 Oct 2024
18:24
27 Dec 2024
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
24 Dec 2024
12:17
Permit Alteration Granted
15 Oct 2024
18:24
3 Jan 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
7 Jan 2025
17:23
Permit Alteration Granted
15 Oct 2024
18:24
17 Jan 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Jan 2025
15:48
Permit Alteration Granted
15 Oct 2024
18:24
27 Jan 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Jan 2025
17:30
Permit Alteration Granted
15 Oct 2024
18:24
5 Feb 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Feb 2025
15:04
Permit Alteration Granted
15 Oct 2024
18:24
12 Feb 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 Feb 2025
14:42
Permit Alteration Granted
15 Oct 2024
18:24
20 Feb 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Feb 2025
13:28
Permit Alteration Granted
15 Oct 2024
18:24
27 Feb 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Feb 2025
15:56
Permit Alteration Granted
15 Oct 2024
18:24
6 Mar 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Mar 2025
15:17
Permit Alteration Granted
15 Oct 2024
18:24
13 Mar 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Mar 2025
15:20
Permit Alteration Granted
15 Oct 2024
18:24
20 Mar 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Mar 2025
08:06
Permit Alteration Granted
15 Oct 2024
18:24
27 Mar 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Mar 2025
19:59
Permit Alteration Granted
15 Oct 2024
18:24
3 Apr 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Apr 2025
16:49
Permit Alteration Granted
15 Oct 2024
18:24
10 Apr 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Apr 2025
15:46
Permit Alteration Granted
15 Oct 2024
18:24
17 Apr 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Apr 2025
22:14
Permit Alteration Granted
15 Oct 2024
18:24
24 Apr 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Apr 2025
16:59
Permit Alteration Granted
15 Oct 2024
18:24
1 May 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
1 May 2025
16:18
Permit Alteration Granted
15 Oct 2024
18:24
8 May 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
7 May 2025
12:59
Permit Alteration Granted
15 Oct 2024
18:24
15 May 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 May 2025
09:15
Permit Alteration Granted
15 Oct 2024
18:24
22 May 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
21 May 2025
09:48
Permit Alteration Granted
15 Oct 2024
18:24
29 May 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 May 2025
12:20
Permit Alteration Granted
15 Oct 2024
18:24
5 Jun 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Jun 2025
15:32
Permit Alteration Granted
15 Oct 2024
18:24
12 Jun 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 Jun 2025
16:26
Permit Alteration Granted
15 Oct 2024
18:24
19 Jun 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Jun 2025
15:56
Permit Alteration Granted
15 Oct 2024
18:24
26 Jun 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Jun 2025
17:38
Permit Alteration Granted
15 Oct 2024
18:24
3 Jul 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Jul 2025
15:59
Permit Alteration Granted
15 Oct 2024
18:24
10 Jul 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
9 Jul 2025
16:16
Permit Alteration Granted
15 Oct 2024
18:24
17 Jul 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
14 Jul 2025
15:24
Permit Alteration Granted
15 Oct 2024
18:24
24 Jul 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Jul 2025
14:34
Permit Alteration Granted
15 Oct 2024
18:24
31 Jul 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
29 Jul 2025
15:40
Permit Alteration Granted
15 Oct 2024
18:24
7 Aug 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Aug 2025
15:08
Permit Alteration Granted
15 Oct 2024
18:24
14 Aug 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 Aug 2025
15:43
Permit Alteration Granted
15 Oct 2024
18:24
21 Aug 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Aug 2025
16:24
Permit Alteration Granted
15 Oct 2024
18:24
28 Aug 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
26 Aug 2025
14:23
Permit Alteration Granted
15 Oct 2024
18:24
4 Sep 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Sep 2025
12:18
Permit Alteration Granted
15 Oct 2024
18:24
11 Sep 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
9 Sep 2025
15:27
Permit Alteration Granted
15 Oct 2024
18:24
18 Sep 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Sep 2025
13:36
Permit Alteration Granted
15 Oct 2024
18:24
25 Sep 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Sep 2025
12:30
Permit Alteration Granted
15 Oct 2024
18:24
2 Oct 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
30 Sep 2025
12:38
Permit Alteration Granted
15 Oct 2024
18:24
9 Oct 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 Oct 2025
16:31
Permit Alteration Granted
15 Oct 2024
18:24
16 Oct 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
14 Oct 2025
14:35
Permit Alteration Granted
15 Oct 2024
18:24
23 Oct 2025
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Oct 2025
16:04
Permit Alteration Granted
15 Oct 2024
18:24
30 Oct 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Oct 2025
10:26
Permit Alteration Granted
15 Oct 2024
18:24
6 Nov 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Nov 2025
11:33
Permit Alteration Granted
15 Oct 2024
18:24
13 Nov 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Nov 2025
10:33
Permit Alteration Granted
15 Oct 2024
18:24
20 Nov 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
18 Nov 2025
15:19
Permit Alteration Granted
15 Oct 2024
18:24
27 Nov 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
26 Nov 2025
14:52
Permit Alteration Granted
15 Oct 2024
18:24
5 Dec 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Dec 2025
15:30
Permit Alteration Granted
15 Oct 2024
18:24
12 Dec 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
9 Dec 2025
11:45
Permit Alteration Granted
15 Oct 2024
18:24
19 Dec 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Dec 2025
14:38
Permit Alteration Granted
15 Oct 2024
18:24
26 Dec 2025
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Dec 2025
10:33
Permit Alteration Granted
15 Oct 2024
18:24
9 Jan 2026
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 Jan 2026
10:55
Permit Alteration Granted
15 Oct 2024
18:24
16 Jan 2026
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Jan 2026
14:05
Permit Alteration Granted
15 Oct 2024
18:24
23 Jan 2026
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Jan 2026
15:09
Permit Alteration Granted
15 Oct 2024
18:24
30 Jan 2026
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Jan 2026
16:29
Permit Alteration Granted
15 Oct 2024
18:24
6 Feb 2026
00:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Feb 2026
08:26
Permit Alteration Granted
15 Oct 2024
18:24
6 Apr 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Apr 2026
09:22
Permit Alteration Granted
15 Oct 2024
18:24
13 Apr 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Apr 2026
16:54
Permit Alteration Granted
15 Oct 2024
18:24
20 Apr 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Apr 2026
15:05
Permit Alteration Granted
15 Oct 2024
18:24
27 Apr 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Apr 2026
12:41
Permit Alteration Granted
15 Oct 2024
18:24
4 May 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 May 2026
10:31
Permit Alteration Granted
15 Oct 2024
18:24
11 May 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 May 2026
15:47
Permit Alteration Granted
15 Oct 2024
18:24
19 May 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 May 2026
14:28
Permit Alteration Granted
15 Oct 2024
18:24
26 May 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
26 May 2026
15:17
Permit Alteration Granted
15 Oct 2024
18:24
2 Jun 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Jun 2026
10:18
Permit Alteration Granted
15 Oct 2024
18:24
9 Jun 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
10 Jun 2026
09:20
Permit Alteration Granted
15 Oct 2024
18:24
16 Jun 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Jun 2026
11:56
Permit Alteration Granted
15 Oct 2024
18:24
23 Jun 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Jun 2026
15:18
Permit Alteration Granted
15 Oct 2024
18:24
30 Jun 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
30 Jun 2026
17:02
Permit Alteration Granted
15 Oct 2024
18:24
10 Jul 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 Jul 2026
12:37
Permit Alteration Granted
15 Oct 2024
18:24
17 Jul 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Jul 2026
16:28
Permit Alteration Granted
15 Oct 2024
18:24
24 Jul 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Jul 2026
17:18
Permit Alteration Granted
15 Oct 2024
18:24
31 Jul 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Jul 2026
16:16
Permit Alteration Granted
15 Oct 2024
18:24
7 Aug 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Aug 2026
13:30
Permit Alteration Granted
15 Oct 2024
18:24
14 Aug 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
10 Aug 2026
12:41
Permit Alteration Granted
15 Oct 2024
18:24
21 Aug 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
17 Aug 2026
14:54
Permit Alteration Granted
15 Oct 2024
18:24
28 Aug 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Aug 2026
16:20
Permit Alteration Granted
15 Oct 2024
18:24
4 Sep 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
1 Sep 2026
12:16
Permit Alteration Granted
15 Oct 2024
18:24
11 Sep 2026
01:00
15 Oct 2024
18:24
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
7 Sep 2026
11:02
Permit Alteration Granted
15 Oct 2024
18:24
18 Sep 2026
01:00
15 Oct 2024
18:24
In Progress

Works Permits for Footpath From Colebrooke Road To Timperley Gardens, Redhill

+
NCT01a (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.

Applies to all permits.

+
NCT01b (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.

Applies to all permits.

+
NCT11a (Display of Permit Number)

For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.

Applies to all permits.

Notes

Proposed Work Dates

Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.

Problems with roadworks?

On rare occasions, issues may occur during or after the completion of roadworks, such as:

  • Poor reinstatement of the footpath or the carriageway.
  • Rubbish and mess remaining after the works have completed.
  • Traffic management issues during the works.
  • Equipment left behind after the works have completed.
  • Any other issues or disruption that the works may be causing.

In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.

In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.

Unfortunately, here at StreetGuide, we are only publishers of the data provided by the organisations and cannot provide information or assistance on individual works.

Contains public sector information licensed under the Open Government Licence v3.0.